Status history
Look up any past day on the Chesapeake Bay Bridge — closures, advisories, and BaySpan recordings.
Mid-day roadwork caused significant 4.5-mile eastbound backups.
Overnight two-way traffic on the westbound span ended before roadwork resumed mid-day, leading to heavy congestion. Eastbound delays peaked at 4.5 miles starting at Exit 28 (Bay Dale Drive) around 12:30 p.m., resulting in travel times of 26 minutes. Westbound motorists also encountered a 1.8-mile backup at Shopping Center Road at noon and 0.6-mile delays near Exit 37 (Route 8) during the 5:00 p.m. hour.
34 updates logged
- 11:12 PMAll clear
There are currently no backups or delays in either direction at the Bay Bridge. As of 11:21 p.m. on Tuesday, June 30, traffic is moving at normal speeds for both eastbound and westbound travelers. While the right lane on the westbound bridge is closed for roadwork, it is not causing any congestion at this time.
- 10:12 PMAll clear
Traffic is currently clear with no backups in either direction. For those planning travel later this week, the best times to head out are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.
- 9:12 PMAll clear
Traffic is currently clear with no backups in either direction. For those planning trips this weekend, the best times to travel on Friday and Sunday are before 10 a.m. and after 10 p.m. On Saturday, the best times to cross are before 7 a.m. or after 5 p.m.
- 8:12 PMAll clear
As of Tuesday night, there are currently no backups or delays approaching the Bay Bridge in either direction. Traffic is flowing at normal speeds for both eastbound and westbound travelers. Although the right lane on the westbound bridge is closed for roadwork, it is not causing any congestion. Drivers should continue to maintain a safe distance from the vehicle in front of them to avoid rear-end collisions.
- 7:12 PMAll clear
As of 7:21 p.m. on Tuesday, June 30th, there are no backups on or approaching the Bay Bridge in either direction. Both eastbound and westbound traffic are moving normally with no delays reported. While the left lane on the bridge is currently closed to discontinue two-way traffic, this is not causing any disruptions to the flow of vehicles.
- 6:12 PMAll clear
Traffic is clear with no delays in either direction as of 6:21 p.m. on Tuesday, June 30th. The bridge is currently operating with three lanes open eastbound and two lanes open westbound. Travel times for both directions remain normal.
- 5:57 PMTraffic advisory
Westbound traffic is experiencing delays beginning at the Route 8 overpass (Exit 37), which is about 0.6 miles from the bridge. While there are currently no delays on the Bay Bridge for eastbound travel, motorists will encounter backups at the Severn River Bridge starting at Exit 27. The bridge is operating with three lanes eastbound and two lanes westbound.
- 4:57 PMAll clear
As of 5:06 p.m. on Tuesday, June 30, eastbound delays begin at Exit 27 near the Severn River Bridge and the right lane of the westbound bridge is closed due to a disabled vehicle. Despite these specific incidents, there are no major backups on the Bay Bridge itself. The bridge is currently operating with three lanes open eastbound and one lane open westbound. Traffic is moving at near normal speeds, with travel times estimated at 10 minutes eastbound and 11 minutes westbound.
- 3:57 PMAll clear
Traffic is currently clear with no delays in either direction at the Bay Bridge as of 4:06 p.m. on Tuesday, June 30th. There are three lanes operating eastbound and two lanes operating westbound. Travel times are normal for this time of day.
- 2:57 PMAll clear
Traffic is currently moving normally with no delays in either direction on the Maryland Bay Bridge as of Tuesday, June 30th, at 3:06 p.m. There are currently three lanes open for eastbound travel and two lanes open for westbound travel.
- 1:57 PMAll clear
Traffic is currently clear with no delays in either direction as of Tuesday, June 30th at 2:06 p.m. There are three lanes open eastbound and two lanes open westbound. Crossing times for both directions are normal.
- 1:42 PMTraffic advisory
As of 1:51 PM on Tuesday, June 30, eastbound traffic is experiencing a 1.5 mile delay beginning at exit 31 (Whitehall Road). Westbound traffic is currently clear with no reported delays. There are three lanes open for eastbound travel and two lanes open for westbound travel.
- 1:27 PMTraffic advisory
As of 1:36 p.m. on Tuesday, June 30th, eastbound traffic is experiencing delays starting at Exit 30 (Whitehall Road), approximately 2.5 miles from the bridge. There are currently three lanes open for eastbound travel and two lanes open for westbound travel. Westbound traffic remains clear with normal travel times and no reported delays.
- 1:12 PMTraffic advisory
Eastbound traffic is experiencing delays starting at Exit 28 (Bay Dale Drive), which is 4.5 miles from the bridge, as of 1:21 p.m. on Tuesday, June 30th. Westbound traffic is currently clear. There are three lanes open eastbound and two lanes open westbound.
- 12:57 PMTraffic advisory
Eastbound traffic is currently experiencing delays starting at exit 28 (Bay Dale Drive), which is approximately 4.5 miles from the bridge. Westbound traffic has no delays, although the left lane on the bridge is closed to prepare for two-way traffic.
- 12:42 PMTraffic advisory
Eastbound US 50 is currently experiencing significant delays starting at Exit 28 (Bay Dale Drive), which is 4.5 miles from the bridge. Westbound traffic is moving normally with no reported delays. Although the left lane on the bridge is closed to prepare for two-way traffic, it is not currently impacting travel times for westbound motorists.
- 12:27 PMTraffic advisory
As of 12:36 p.m. on Tuesday, June 30th, eastbound traffic is experiencing delays starting at Exit 28 (Bay Dale Drive), which is 4.5 miles from the bridge. Westbound traffic is currently moving with no delays.
- 12:12 PMTraffic advisory
There are currently delays in both directions at the Bay Bridge. Eastbound traffic is backed up for three miles starting at Exit 29b (Cape Saint Claire Road). Westbound traffic is experiencing a 1.8 mile delay beginning at Shopping Center Road.
- 11:57 AMTraffic advisory
Both directions of the Bay Bridge are currently experiencing significant backups as of 12:06 p.m. on Tuesday, June 30th. Eastbound traffic is delayed for three miles starting at Exit 29b (Kate St Clair Road), and westbound traffic is backed up for 1.5 miles starting at Exit 38a (Duke Street). These delays are due to roadwork on the bridge where the right lane is closed, leaving only the two left lanes open for travel.
- 10:57 AMAll clear
As of 11:06 a.m. on Tuesday, June 30, there are no backups or delays in either direction on the Bay Bridge. Traffic is flowing normally for both eastbound and westbound travelers. Although the right lane is closed for maintenance work, westbound traffic continues to move without delay.
- 9:57 AMAll clear
Traffic is currently clear with no backups approaching the Bay Bridge in either direction. For those planning to travel over the upcoming weekend, the best times to cross are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.
- 9:42 AMTraffic advisory
Eastbound traffic is currently delayed for 1.5 miles starting at Exit 31 (Whitehall Road). Westbound traffic is moving normally with no delays.
- 9:27 AMTraffic advisory
Eastbound travelers are currently experiencing delays starting at Exit 31 (Whitehall Road), which is approximately 1.5 miles from the bridge. Westbound traffic is moving smoothly with no reported delays.
- 9:12 AMTraffic advisory
Eastbound traffic is currently experiencing delays starting at exit 31 (Whitehall Road), which is 1.5 miles from the bridge. Westbound traffic is moving normally with no delays reported.
- 8:57 AMTraffic advisory
As of 9:06 a.m. on Tuesday, June 30th, eastbound traffic is experiencing delays starting at exit 31 Whitehall Road, which is 1.5 miles from the bridge. Westbound traffic is currently clear with normal travel times.
- 8:42 AMTraffic advisory
As of 8:51 a.m. on Tuesday, June 30th, eastbound traffic is experiencing delays starting at Exit 31 (Whitehall Road), approximately 1.5 miles from the bridge. Westbound traffic is currently clear with no reported delays.
- 7:42 AMAll clear
Currently, there are no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For those planning trips this weekend, the best times to travel are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m. Remember to maintain a safe distance from the vehicle in front of you to avoid rear-end collisions.
- 6:42 AMAll clear
As of 6:51 a.m. on Tuesday, June 30th, traffic is currently clear with no backups approaching the Bay Bridge in either direction.
For those planning trips over the upcoming weekend, the best times to travel are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.
- 5:42 AMAll clear
There are currently no backups approaching the Bay Bridge in either direction as of Tuesday morning, June 30th, and travel times remain normal. For those planning trips over the upcoming weekend, the best times to travel are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.
- 4:42 AMAll clear
Traffic is currently clear and moving at normal speeds. For those planning trips this upcoming weekend, the best times to travel are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.
- 3:42 AMAll clear
Traffic is currently clear with no backups or delays, and travel times remain within normal ranges. Both eastbound and westbound traffic are restricted to a single lane. The eastbound bridge is closed for road work, and the westbound bridge has the center lane closed to serve as a buffer.
- 2:42 AMAll clear
Traffic is currently clear with no backups or delays. The eastbound bridge is closed for road work. All traffic is being diverted to the westbound bridge, which is operating with one lane open in each direction and the center lane closed as a buffer.
- 1:42 AMAll clear
There are currently no backups or delays on or approaching the Bay Bridge, and traffic is flowing at normal speeds. The eastbound bridge is closed for road work, so all travel is diverted to the westbound bridge. Traffic is operating with one lane open in each direction, and the center lane is closed to serve as a buffer.
- 12:42 AMAll clear
As of Tuesday, June 30th at 12:51 a.m., there are no backups or delays on or approaching the Bay Bridge. Travel times remain normal in both directions. The eastbound bridge is closed for roadwork, and traffic is restricted to one lane eastbound and one lane westbound on the remaining span. The center lane on the westbound bridge is also closed to serve as a buffer.