  1. 11:13 PMAll clear

    As of 11:20 PM on Saturday, April 25th, there are currently no backups in either direction approaching the Bay Bridge. For those planning to travel through the remainder of the weekend, the best times to cross on Sunday are before 10 a.m. and after 10 p.m.

  2. 11:12 PMAll clear

    As of 11:20 PM on Saturday, April 25th, there are currently no backups in either direction approaching the Bay Bridge. For those planning to travel through the remainder of the weekend, the best times to cross on Sunday are before 10 a.m. and after 10 p.m.

  3. 10:13 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For those traveling during the rest of the weekend, the best times to avoid congestion are Saturday after 5 p.m. and Sunday before 10 a.m. or after 10 p.m. Drivers should maintain a safe following distance from the vehicle in front of them to avoid rear-end collisions.

  4. 10:12 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For those traveling during the rest of the weekend, the best times to avoid congestion are Saturday after 5 p.m. and Sunday before 10 a.m. or after 10 p.m. Drivers should maintain a safe following distance from the vehicle in front of them to avoid rear-end collisions.

  5. 9:12 PMAll clear

    As of 9:22 p.m. on Saturday, April 25th, there are currently no backups approaching the Bay Bridge in either direction.

    For the remainder of the weekend, the best times to travel are Saturday after 5 p.m. and Sunday before 10 a.m. or after 10 p.m.

  6. 8:12 PMAll clear

    As of Saturday, April 25th at 8:20 PM, there are no backups approaching the Bay Bridge in either direction, with traffic moving at normal speeds. For those traveling through the remainder of the weekend, the best times to cross on Saturday are after 5 PM. On Sunday, the lightened travel windows are before 10 AM and after 10 PM.

  7. 8:12 PMAll clear

    As of Saturday, April 25th at 8:20 PM, there are no backups approaching the Bay Bridge in either direction, with traffic moving at normal speeds. For those traveling through the remainder of the weekend, the best times to cross on Saturday are after 5 PM. On Sunday, the lightened travel windows are before 10 AM and after 10 PM.

  8. 7:13 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction. For the remainder of the weekend, the best times to travel are Saturday after 5 p.m., and Sunday before 10 a.m. or after 10 p.m. Generally, Friday travel is best before 10 a.m. or after 10 p.m., while Saturday travel is smoothest before 7 a.m. or after 5 p.m.

  9. 7:12 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction. For the remainder of the weekend, the best times to travel are Saturday after 5 p.m., and Sunday before 10 a.m. or after 10 p.m. Generally, Friday travel is best before 10 a.m. or after 10 p.m., while Saturday travel is smoothest before 7 a.m. or after 5 p.m.

  10. 6:13 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction as of 6:22 PM on Saturday, April 25th. Traffic flow is normal. For the remainder of the weekend, the best times to travel are Saturday after 5 p.m. and Sunday before 10 a.m. or after 10 p.m.

  11. 6:12 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction as of 6:22 PM on Saturday, April 25th. Traffic flow is normal. For the remainder of the weekend, the best times to travel are Saturday after 5 p.m. and Sunday before 10 a.m. or after 10 p.m.

  12. 5:12 PMAll clear

    Traffic is moving normally with no backups currently reported in either direction. For those traveling throughout the remainder of the weekend, the best times to be on the road on Sunday are before 10 a.m. and after 10 p.m.

  13. 4:12 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, with traffic moving at normal speeds. For those traveling throughout the rest of the weekend, the best times to head out are Saturday after 5:00 p.m. and Sunday before 10:00 a.m. or after 10:00 p.m.

  14. 3:17 PMAll clear

    There are currently no backups on or approaching the Bay Bridge in either direction. As of Saturday, April 25th at 3:26 PM, traffic is flowing at normal speeds. For those traveling later this weekend, the best times to move through the area are Saturday after 5 p.m. and Sunday before 10 a.m. or after 10 p.m.

  15. 3:17 PMAll clear

    There are currently no backups on or approaching the Bay Bridge in either direction. As of Saturday, April 25th at 3:26 PM, traffic is flowing at normal speeds. For those traveling later this weekend, the best times to move through the area are Saturday after 5 p.m. and Sunday before 10 a.m. or after 10 p.m.

  16. 2:16 PMAll clear

    Traffic is currently normal in both directions on the Bay Bridge as of Saturday afternoon at 2:20 p.m. Travel times are at typical levels, and motorists are advised to stay on US 50.

  17. 2:16 PMAll clear

    Traffic is currently normal in both directions on the Bay Bridge as of Saturday afternoon at 2:20 p.m. Travel times are at typical levels, and motorists are advised to stay on US 50.

  18. 2:02 PMConstruction

    As of Saturday, April 25th at 2:12 p.m., there are currently no backups or delays in either direction on the Bay Bridge. Traffic is flowing normally eastbound and westbound, even with the westbound left lane closed for two-way traffic preparation.

  19. 2:02 PMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge in either direction as of Saturday, April 25th at 2:12 p.m. Eastbound and westbound traffic are moving at normal speeds. The westbound left lane is closed for two-way traffic preparation, though this is not currently impacting travel times.

  20. 1:47 PMConstruction

    As of 1:56 p.m. on Saturday, April 25th, there are no backups or delays in either direction at the Bay Bridge. Both eastbound and westbound traffic are moving at normal speeds, even with the left lane closed on the westbound bridge for two-way traffic preparation.

  21. 1:32 PMIssue reported

    Traffic is currently clear with no backups in either direction on the Bay Bridge. As of Saturday, April 25th, at 1:42 PM, both eastbound and westbound travel times are normal. While the westbound left lane is closed to prepare for two-way traffic, this closure is not currently causing any delays.

  22. 1:22 PMConstruction

    As of 1:32 PM on Saturday, April 25th, there are currently no backups or delays in either direction on the Bay Bridge. Traffic is moving at normal speeds despite the westbound left lane being closed for two-way traffic preparation.

  23. 1:22 PMConstruction

    As of 1:32 PM on Saturday, April 25th, there are currently no backups or delays in either direction on the Bay Bridge. Traffic is moving at normal speeds despite the westbound left lane being closed for two-way traffic preparation.

  24. 1:12 PMConstruction

    Traffic is currently clear with no backups or delays in either direction. While the left lane on the westbound bridge is closed for two-way traffic preparation, travel times remain normal for both eastbound and westbound travelers.

  25. 12:57 PMConstruction

    As of 1:06 p.m. on Saturday, April 25th, there are no backups or delays on the Bay Bridge in either direction. Traffic is flowing at normal speeds for both eastbound and westbound commuters. While the left lane is currently closed to prepare for two-way traffic operations, it is not impacting travel times.

  26. 12:42 PMConstruction

    There are currently no backups or delays in either direction on the Bay Bridge as of Saturday, April 25th, at 12:50 PM. Traffic is moving at normal speeds despite a left lane closure on the bridge for two-way traffic preparation.

  27. 12:28 PMConstruction

    No backups or delays are currently reported on the Bay Bridge in either direction as of 12:36 p.m. on Saturday, April 25. Traffic is moving normally, though the westbound left lane is closed to prepare for two-way traffic.

  28. 12:27 PMConstruction

    No backups or delays are currently reported on the Bay Bridge in either direction as of 12:36 p.m. on Saturday, April 25. Traffic is moving normally, though the westbound left lane is closed to prepare for two-way traffic.

  29. 12:12 PMConstruction

    Traffic is currently clear with no backups approaching the Bay Bridge in either direction. Both eastbound and westbound travel times remain normal. While the left lane is closed for two-way traffic preparation, motorists are not experiencing any delays.

  30. 11:57 AMConstruction

    Traffic is currently clear with no backups or delays in either direction. As of Saturday at 12:07 PM, travel conditions are normal even with the left lane closed on the bridge for two-way traffic preparation.

  31. 11:57 AMConstruction

    Traffic is currently clear with no backups or delays in either direction. As of Saturday at 12:07 PM, travel conditions are normal even with the left lane closed on the bridge for two-way traffic preparation.

  32. 11:47 AMConstruction

    As of 11:56 a.m. on Saturday, April 25th, there are no backups or delays approaching the Bay Bridge in either direction. Traffic flow is normal for both eastbound and westbound motorists. Please be aware that the left lane on the bridge is closed to prepare for two-way traffic operations.

  33. 11:37 AMConstruction

    There are currently no backups or delays on the Bay Bridge in either direction. As of 11:46 a.m. on Saturday, April 25th, traffic is moving at normal speeds. The left lane on the westbound bridge is closed to prepare for two-way traffic, but flow remains steady.

  34. 11:22 AMConstruction

    There are currently no backups or delays in either direction on the Bay Bridge. Traffic flow is normal for both eastbound and westbound travel. The westbound left lane remains closed for two-way traffic preparation, but this is not causing any impact on travel times.

  35. 11:22 AMConstruction

    There are currently no backups or delays in either direction on the Bay Bridge. Traffic flow is normal for both eastbound and westbound travel. The westbound left lane remains closed for two-way traffic preparation, but this is not causing any impact on travel times.

  36. 11:12 AMConstruction

    As of 11:20 am on Saturday, April 25th, there are no backups or delays currently affecting the Bay Bridge in either direction. Both eastbound and westbound traffic are moving at normal speeds. The left lane on the bridge is closed to prepare for two-way traffic operations, though this is not impacting travel times.

  37. 11:12 AMConstruction

    As of 11:20 am on Saturday, April 25th, there are no backups or delays currently affecting the Bay Bridge in either direction. Both eastbound and westbound traffic are moving at normal speeds. The left lane on the bridge is closed to prepare for two-way traffic operations, though this is not impacting travel times.

  38. 10:12 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is flowing at normal speeds. For the remainder of the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m. On Sunday, the lightest traffic is expected before 10 a.m. and after 10 p.m.

  39. 10:12 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is flowing at normal speeds. For the remainder of the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m. On Sunday, the lightest traffic is expected before 10 a.m. and after 10 p.m.

  40. 9:12 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For the remainder of the weekend, the best times to travel are Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m. Drivers should maintain a safe following distance from other vehicles to avoid rear-end collisions.

  41. 8:12 AMAll clear

    As of 8:21 a.m. on Saturday, April 25th, there are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For those traveling later this weekend, the best times to cross are after 5 p.m. today, or on Sunday before 10 a.m. and after 10 p.m.

  42. 8:12 AMAll clear

    As of 8:21 a.m. on Saturday, April 25th, there are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For those traveling later this weekend, the best times to cross are after 5 p.m. today, or on Sunday before 10 a.m. and after 10 p.m.

  43. 7:12 AMAll clear

    Traffic is currently clear with no backups approaching the Bay Bridge in either direction, and travel times remain normal. For the remainder of the weekend, the best times to travel are Saturday after 5:00 p.m., and Sunday before 10:00 a.m. or after 10:00 p.m.

  44. 7:12 AMAll clear

    Traffic is currently clear with no backups approaching the Bay Bridge in either direction, and travel times remain normal. For the remainder of the weekend, the best times to travel are Saturday after 5:00 p.m., and Sunday before 10:00 a.m. or after 10:00 p.m.

  45. 6:12 AMAll clear

    There are currently no backups on or approaching the Bay Bridge in either direction. For the remainder of the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m., and on Sunday before 10 a.m. and after 10 p.m.

  46. 6:12 AMAll clear

    There are currently no backups on or approaching the Bay Bridge in either direction. For the remainder of the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m., and on Sunday before 10 a.m. and after 10 p.m.

  47. 5:12 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction. If you are traveling later this weekend, the best times to avoid congestion are Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

  48. 5:12 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction. If you are traveling later this weekend, the best times to avoid congestion are Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

  49. 4:17 AMAll clear

    Currently, there are no backups approaching the Bay Bridge in either direction. As of 4:26 a.m. on Saturday, April 25th, traffic is flowing normally. For the remainder of the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m. On Sunday, the best times to cross are before 10 a.m. and after 10 p.m.

  50. 4:17 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is flowing at normal speeds as of 4:26 a.m. on Saturday, April 25th. For the remainder of the day, the best times to travel are before 7 a.m. and after 5 p.m. If you are traveling on Sunday, the lightest traffic volume is expected before 10 a.m. and after 10 p.m.

  51. 3:17 AMAll clear

    As of Saturday, April 25th at 3:26 a.m., traffic is moving normally with no backups approaching the Bay Bridge in either direction. For those traveling later this weekend, the best times to cross on Saturday are before 7 a.m. and after 5 p.m. On Sunday, optimal travel times are before 10 a.m. and after 10 p.m.

  52. 2:17 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction as of 2:26 a.m. on Saturday, April 25th. Traffic is moving at normal speeds, though drivers should maintain a safe following distance to prevent rear-end collisions. For the remainder of the weekend, the best times to travel are Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  53. 2:17 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction as of 2:26 a.m. on Saturday, April 25th. Traffic is moving at normal speeds, though drivers should maintain a safe following distance to prevent rear-end collisions. For the remainder of the weekend, the best times to travel are Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  54. 1:17 AMAll clear

    As of Saturday, April 25 at 1:26 a.m., there are currently no backups approaching the Bay Bridge in either direction, and travel times remain normal. For the remainder of the weekend, the best times to travel are Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  55. 1:17 AMAll clear

    As of Saturday, April 25 at 1:26 a.m., there are currently no backups approaching the Bay Bridge in either direction, and travel times remain normal. For the remainder of the weekend, the best times to travel are Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  56. 12:17 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction as of 12:26 a.m. Saturday, April 25th, with traffic maintaining normal travel times. For those traveling during the remainder of the weekend, the best times to move through the area are Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

  57. 12:17 AMAll clear

    As of 12:26 a.m. on Saturday, April 25th, there are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For the remainder of the weekend, the best times to travel are Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.