Live statusBay Bridge Status

Status history

Look up any past day on the Chesapeake Bay Bridge — closures, advisories, and BaySpan recordings.

March 2026

Wednesday, March 25, 2026

Jump to today

95 updates logged

  1. 11:47 PMConstruction

    Traffic is currently clear with no backups or delays in either direction. Both eastbound and westbound travel times are normal. On the westbound span, the two right lanes are closed for roadwork. Normal travel conditions are reported throughout the area.

  2. 11:32 PMIssue reported

    There are currently no backups or delays approaching or crossing the Bay Bridge in either direction. Traffic flow remains normal despite active lane closures to discontinue two-way traffic; specifically, the left lane is closed eastbound and the two right lanes are closed westbound.

  3. 11:32 PMConstruction

    There are currently no backups or delays approaching or crossing the Bay Bridge in either direction. Traffic flow remains normal despite active lane closures to discontinue two-way traffic; specifically, the left lane is closed eastbound and the two right lanes are closed westbound.

  4. 11:27 PMBridge closed

    There are currently no backups or delays on or approaching the Bay Bridge, and traffic is moving at normal speeds. As of Wednesday night, the eastbound bridge is closed to discontinue two-way traffic. Current lane configurations include two lanes open eastbound and one lane open westbound.

  5. 11:12 PMConstruction

    As of Wednesday, March 25th at 11:20 p.m., there are no backups or delays on or approaching the bridge. Traffic is moving at normal speeds. Due to road work, the westbound bridge is closed, and travel is restricted to one lane in each direction.

  6. 10:57 PMConstruction

    Traffic is currently clear with no backups or delays on or approaching the bridge. The westbound span is closed for road work, with traffic restricted to one lane in each direction. Despite the construction, travel times remain normal.

  7. 10:42 PMConstruction

    Traffic is currently clear with no backups or delays on or approaching the bridge. The westbound span is closed for road work, and traffic is operating in a two-way configuration with one lane open in each direction. Travel times are currently normal.

  8. 10:27 PMConstruction

    As of 10:35 p.m. on Wednesday, March 25th, there are no backups or delays currently approaching or on the Bay Bridge. Traffic is flowing at normal durations in both directions. The westbound bridge is closed for maintenance, resulting in a two-way traffic configuration with one lane open eastbound and one lane open westbound.

  9. 10:27 PMConstruction

    As of 10:35 p.m. on Wednesday, March 25th, there are no backups or delays currently approaching or on the Bay Bridge. Traffic is flowing at normal durations in both directions. The westbound bridge is closed for maintenance, resulting in a two-way traffic configuration with one lane open eastbound and one lane open westbound.

  10. 10:12 PMConstruction

    There are no backups or delays currently at the Bay Bridge. While traffic is moving at normal speeds, the westbound bridge is closed for road work. All traffic is being diverted to the eastbound span, which is operating with one lane open in each direction.

  11. 9:57 PMConstruction

    Traffic is currently moving normally with no backups or delays. The westbound bridge is closed for road work, and traffic is restricted to one lane in each direction.

  12. 9:42 PMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge as of 9:50 p.m. Wednesday, March 25th. While travel times remain normal, the westbound bridge is closed for road work. Traffic is currently reduced to one lane in each direction.

  13. 9:12 PMTraffic advisory

    Eastbound traffic is currently experiencing delays starting at Exit 32 Sandy Point, approximately one mile from the bridge. The westbound bridge is closed for roadwork, and traffic is being diverted to the eastbound span, which is operating with one lane open in each direction. There are currently no delays reported for westbound travel.

  14. 9:12 PMTraffic advisory

    Eastbound traffic is currently experiencing delays starting at Exit 32 Sandy Point, approximately one mile from the bridge. The westbound bridge is closed for roadwork, and traffic is being diverted to the eastbound span, which is operating with one lane open in each direction. There are currently no delays reported for westbound travel.

  15. 9:07 PMBridge closed

    Eastbound traffic is experiencing delays starting at Exit 32 (Sandy Point), approximately one mile from the bridge. The westbound bridge is currently closed for roadwork, and traffic is being diverted into a two-way configuration with only one lane open in each direction. There are no delays reported for westbound travel.

  16. 8:52 PMTraffic advisory

    Eastbound traffic is currently experiencing delays starting at exit 31 (Whitehall Road), approximately 1.5 miles from the bridge. Westbound travel remains clear. Due to ongoing roadwork, the westbound bridge is closed, and traffic is restricted to a single lane in each direction.

  17. 8:47 PMBridge closed

    As of 8:55 p.m. on Wednesday, March 25th, eastbound traffic is delayed starting at Exit 31 (Whitehall Road), approximately 1.5 miles from the bridge. The westbound bridge is closed for road work, and authorities are currently operating with only one lane open in each direction. Westbound traffic is currently clear with no reported delays.

  18. 8:32 PMTraffic advisory

    Eastbound traffic is delayed for 1.5 miles starting at Exit 31 (Whitehall Road). Westbound traffic is currently clear. The westbound bridge is closed for road work, and traffic is restricted to one lane in each direction.

  19. 8:17 PMTraffic advisory

    Traffic is currently delayed in both directions with the westbound bridge closed for roadwork. Two-way traffic is restricted to a single lane in each direction. Westbound delays begin at Exit 37 (Route 8 overpass), roughly 0.6 miles from the bridge. Eastbound backups start at Exit 31 (Whitehall Road), about 1.5 miles from the bridge.

  20. 8:17 PMBridge closed

    Traffic is currently delayed in both directions with the westbound bridge closed for roadwork. Two-way traffic is restricted to a single lane in each direction. Westbound delays begin at Exit 37 (Route 8 overpass), roughly 0.6 miles from the bridge. Eastbound backups start at Exit 31 (Whitehall Road), about 1.5 miles from the bridge.

  21. 7:17 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and travel times remain normal. For those planning travel later this weekend, the best times to cross are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  22. 7:02 PMWind advisory

    There are currently no delays at the Bay Bridge in either direction, with traffic moving at normal speeds. However, the bridge is operating under wind warnings due to sustained wind speeds between 30 and 39 miles per hour. Drivers of house trailers, box trailers, and other vehicles vulnerable to high winds should exercise caution when crossing.

  23. 6:47 PMWind advisory

    As of Wednesday evening, there are currently no backups or delays in either direction at the Bay Bridge. While the westbound left lane is closed to end two-way traffic, travel remains fluid. Wind warnings are in effect with sustained speeds between 30 and 39 mph; drivers of house trailers, box trailers, and other wind-vulnerable vehicles should use caution when crossing.

  24. 6:47 PMWind advisory

    As of Wednesday evening, there are currently no backups or delays in either direction at the Bay Bridge. While the westbound left lane is closed to end two-way traffic, travel remains fluid. Wind warnings are in effect with sustained speeds between 30 and 39 mph; drivers of house trailers, box trailers, and other wind-vulnerable vehicles should use caution when crossing.

  25. 6:32 PMWind advisory

    As of Wednesday at 6:40 p.m., there are no backups or delays on the Bay Bridge in either direction. Although traffic is flowing normally, the westbound left lane is currently closed to discontinue two-way traffic. Wind warnings are in effect with sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other wind-vulnerable vehicles should use caution when crossing.

  26. 5:31 PMAll clear

    Traffic on the Bay Bridge is currently clear with no delays in either direction as of Wednesday at 5:40 p.m. There are three lanes open eastbound and two lanes open westbound, with travel times remaining at normal levels.

  27. 4:32 PMAll clear

    Traffic is clear with no delays in either direction as of Wednesday, March 25th at 4:40 p.m. There are currently three lanes operating eastbound and two lanes operating westbound.

  28. 4:32 PMAll clear

    Traffic is clear with no delays in either direction as of Wednesday, March 25th at 4:40 p.m. There are currently three lanes operating eastbound and two lanes operating westbound.

  29. 3:32 PMAll clear

    Traffic is currently moving normally with no delays in either direction as of Wednesday at 3:41 p.m. The bridge is operating with three lanes eastbound and two lanes westbound, and travel times remain consistent with typical conditions.

  30. 3:32 PMAll clear

    Traffic is currently moving normally with no delays in either direction as of Wednesday at 3:41 p.m. The bridge is operating with three lanes eastbound and two lanes westbound, and travel times remain consistent with typical conditions.

  31. 3:17 PMTraffic advisory

    Eastbound traffic is experiencing delays beginning at Exit 32 (Sandy Point), roughly one mile from the bridge. Westbound traffic is currently clear. There are three lanes open eastbound and two lanes open westbound.

  32. 3:02 PMConstruction

    Traffic is currently clear with no backups or delays in either direction as of Wednesday, March 25th at 3:11 PM. Travel times remain normal, even with the westbound left lane closed for two-way traffic preparation.

  33. 2:47 PMConstruction

    As of 2:56 p.m. on Wednesday, March 25th, traffic is flowing normally with no backups or delays in either direction. While the left lane on the westbound span is currently closed to prepare for two-way traffic, it is not impacting travel times. Drivers should maintain a safe following distance to avoid rear-end collisions.

  34. 2:32 PMConstruction

    As of 2:41 p.m. on Wednesday, March 25th, there are no backups or delays approaching the Bay Bridge in either direction. While the right lane is currently closed for roadwork on the westbound span, traffic continues to flow normally. Travel times are typical for both eastbound and westbound motorists.

  35. 2:17 PMConstruction

    Traffic is currently clear in both directions with no backups or delays reported as of Wednesday afternoon. While the right lane is closed for road work, travel times remain normal for both eastbound and westbound motorists.

  36. 2:02 PMConstruction

    As of 2:11 p.m. on Wednesday, March 25th, traffic is clear with no backups or delays in either direction. Both eastbound and westbound travel times are normal, though the right lane on the westbound bridge is currently closed for road work.

  37. 1:47 PMConstruction

    As of 1:56 p.m. on Wednesday, March 25th, traffic is flowing normally with no backups or delays in either direction. While there is a right lane closure on the westbound bridge due to roadwork, travel times remain unaffected.

  38. 1:32 PMConstruction

    Traffic is currently clear with no backups or delays in either direction as of Wednesday, March 25th at 1:41 PM. While the westbound right lane is closed for road work, travel times remain normal for both eastbound and westbound commuters.

  39. 1:17 PMConstruction

    As of Wednesday, March 25th at 1:26 p.m., there are currently no backups or delays in either direction at the Bay Bridge. While the right lane is closed for ongoing roadwork, traffic flow remains normal.

  40. 1:03 PMConstruction

    Traffic is currently clear with no backups or delays reported in either direction. As of Wednesday at 1:11 p.m., travel times are normal for both eastbound and westbound motorists. While traffic is moving freely, the right lane on the westbound bridge is closed for road work. Maintain a safe following distance from other vehicles to avoid rear-end collisions while traveling through the work zone.

  41. 1:03 PMConstruction

    Traffic is currently clear with no backups or delays reported in either direction. As of Wednesday at 1:11 p.m., travel times are normal for both eastbound and westbound motorists. While traffic is moving freely, the right lane on the westbound bridge is closed for road work. Maintain a safe following distance from other vehicles to avoid rear-end collisions while traveling through the work zone.

  42. 12:47 PMConstruction

    As of Wednesday, March 25th at 12:56 p.m., there are no backups or delays in either direction at the Bay Bridge. Traffic is moving at normal speeds eastbound and westbound. While the right lane on the westbound bridge is closed for road work, traffic continues to flow freely without congestion.

  43. 12:32 PMConstruction

    Traffic is currently clear with no backups or delays in either direction. Even though the right lane is closed for roadwork on the westbound bridge, flow remains normal and travel times are unaffected.

  44. 12:17 PMConstruction

    As of Wednesday, March 25 at 12:26 p.m., traffic is flowing normally with no delays or backups in either direction. Both eastbound and westbound travel times are currently at typical durations. Although the right lane of the westbound bridge is closed for road work, it is not impacting the flow of traffic at this time.

  45. 12:17 PMConstruction

    As of Wednesday, March 25 at 12:26 p.m., traffic is flowing normally with no delays or backups in either direction. Both eastbound and westbound travel times are currently at typical durations. Although the right lane of the westbound bridge is closed for road work, it is not impacting the flow of traffic at this time.

  46. 12:03 PMConstruction

    As of Wednesday, March 25th at 12:11 PM, there are no backups or delays approaching the Bay Bridge in either direction. Traffic is flowing at normal speeds for both eastbound and westbound travelers. While the right lane on the westbound bridge is closed for road work, it is not currently causing any congestion.

  47. 12:03 PMConstruction

    As of Wednesday, March 25th at 12:11 PM, there are no backups or delays approaching the Bay Bridge in either direction. Traffic is flowing at normal speeds for both eastbound and westbound travelers. While the right lane on the westbound bridge is closed for road work, it is not currently causing any congestion.

  48. 11:48 AMConstruction

    As of 11:56 a.m. on Wednesday, March 25th, there are no backups or delays on the Bay Bridge in either direction. While traffic is flowing normally, the right lane on the westbound bridge is currently closed for roadwork.

  49. 11:47 AMConstruction

    As of 11:56 a.m. on Wednesday, March 25th, there are no backups or delays on the Bay Bridge in either direction. While traffic is flowing normally, the right lane on the westbound bridge is currently closed for roadwork.

  50. 11:32 AMConstruction

    There are currently no backups or delays on the Bay Bridge in either direction. As of Wednesday, March 25th at 11:41 a.m., traffic is flowing normally for both eastbound and westbound travelers. On the westbound bridge, the right lane is closed for road work, but it is not currently impacting travel times.

  51. 11:18 AMConstruction

    Traffic is currently clear with no backups in either direction on or approaching the bridge. While the right lane of the westbound span is closed for road work, motorists are experiencing normal travel times both eastbound and westbound.

  52. 11:17 AMConstruction

    Traffic is currently clear with no backups in either direction on or approaching the bridge. While the right lane of the westbound span is closed for road work, motorists are experiencing normal travel times both eastbound and westbound.

  53. 11:02 AMConstruction

    As of Wednesday morning, traffic is flowing smoothly with no backups or delays in either direction. While the right lane is currently closed for road work on the westbound bridge, travel times remain normal for all commuters.

  54. 10:47 AMConstruction

    As of 10:56 a.m. on Wednesday, March 25th, there are no backups or delays in either direction at the Bay Bridge. While traffic is currently flowing at normal speeds, the right lane on the westbound bridge is closed for roadwork.

  55. 10:32 AMConstruction

    There are currently no backups or delays on the Bay Bridge in either direction. Traffic is flowing normally for both eastbound and westbound commuters. While the right lane is closed on the bridge for roadwork, westbound travel remains clear.

  56. 10:17 AMConstruction

    As of Wednesday, March 25th, at 10:26 a.m., there are no backups or delays in either direction at the Bay Bridge. Traffic is currently flowing at normal speeds both eastbound and westbound, despite the right lane being closed for roadwork.

  57. 10:03 AMConstruction

    As of 10:11 a.m. on Wednesday, March 25th, there are currently no backups or delays in either direction at the Bay Bridge. While traffic is flowing normally, the right lane on the westbound bridge is closed for roadwork.

  58. 9:47 AMConstruction

    As of Wednesday morning at 9:56 a.m., traffic is clear with no backups on or approaching the bridge in either direction. Both eastbound and westbound travel times are normal. Please note that the right lane is currently closed for road work on the westbound span.

  59. 9:47 AMConstruction

    As of Wednesday morning at 9:56 a.m., traffic is clear with no backups on or approaching the bridge in either direction. Both eastbound and westbound travel times are normal. Please note that the right lane is currently closed for road work on the westbound span.

  60. 9:32 AMConstruction

    As of 9:41 a.m., there are currently no backups or delays in either direction at the Bay Bridge. Traffic is moving normally eastbound and westbound, though the right lane on the bridge is closed for ongoing road work.

  61. 8:33 AMAll clear

    Traffic is currently clear with no backups in either direction and travel times are at normal durations. For those planning trips this weekend, the best times to travel are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  62. 8:33 AMAll clear

    Traffic is currently clear with no backups in either direction and travel times are at normal durations. For those planning trips this weekend, the best times to travel are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  63. 7:32 AMAll clear

    Current traffic is normal with no backups in either direction as of Wednesday morning. For those planning weekend trips, the best times to travel are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  64. 6:33 AMAll clear

    Current traffic is clear with no backups approaching the Bay Bridge in either direction. For those planning weekend travel, the best times to cross are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  65. 6:32 AMAll clear

    Current traffic is clear with no backups approaching the Bay Bridge in either direction. For those planning weekend travel, the best times to cross are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  66. 5:37 AMAll clear

    Traffic is currently clear with no backups approaching the Bay Bridge in either direction. For those planning travel this weekend, the best times to head out are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  67. 5:37 AMAll clear

    Traffic is currently clear with no backups approaching the Bay Bridge in either direction. For those planning travel this weekend, the best times to head out are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  68. 4:37 AMAll clear

    As of 4:45 a.m. on Wednesday, March 25th, there are currently no backups approaching the Bay Bridge in either direction, with traffic moving at normal speeds.

    For those traveling this upcoming weekend, the best times to cross are before 10 a.m. or after 10 p.m. on both Friday and Sunday. On Saturday, plan to travel before 7 a.m. or after 5 p.m. to avoid delays.

  69. 4:22 AMConstruction

    As of 4:30 a.m. on Wednesday, March 25, there are currently no backups or delays in either direction on the Bay Bridge. While the two left lanes are closed to discontinue two-way traffic, both eastbound and westbound travel remain clear.

  70. 4:22 AMConstruction

    As of 4:30 a.m. on Wednesday, March 25, there are currently no backups or delays in either direction on the Bay Bridge. While the two left lanes are closed to discontinue two-way traffic, both eastbound and westbound travel remain clear.

  71. 4:07 AMConstruction

    There are currently no backups or delays at the Bay Bridge, and traffic is moving at normal speeds in both directions. As of 4:15 a.m. on Wednesday, March 25th, the bridge is operating with one lane open westbound and three lanes open eastbound. The center lane on the westbound bridge remains closed for road work.

  72. 3:52 AMConstruction

    Traffic is currently clear with no backups or delays. As of 4 a.m. Wednesday, the eastbound bridge is closed for roadwork. Both eastbound and westbound traffic are sharing the westbound bridge, which is operating with one lane open in each direction and the center lane closed as a buffer.

  73. 3:52 AMConstruction

    Traffic is currently clear with no backups or delays. As of 4 a.m. Wednesday, the eastbound bridge is closed for roadwork. Both eastbound and westbound traffic are sharing the westbound bridge, which is operating with one lane open in each direction and the center lane closed as a buffer.

  74. 3:47 AMBridge closed

    Traffic is currently clear with no backups or delays in either direction, and travel times remain normal. The eastbound bridge is closed for roadwork, resulting in two-way traffic on the westbound span. Currently, one lane is open for eastbound travel and one lane is open for westbound travel, with the center lane of the westbound bridge closed as a buffer.

  75. 3:32 AMConstruction

    As of 3:40 a.m. on Wednesday, March 25th, there are no backups or delays on or approaching the Bay Bridge. While traffic is currently moving at normal speeds, the eastbound bridge is closed for road work. All travel is restricted to the westbound bridge, which is operating with one lane open in each direction and the center lane closed as a buffer.

  76. 3:32 AMConstruction

    As of 3:40 a.m. on Wednesday, March 25th, traffic is currently clear with no backups or delays on or approaching the Bay Bridge.

    The eastbound bridge is closed for road work, restricting travel to one lane in each direction on the westbound bridge. Additionally, the center lane on the westbound span is closed as a buffer. Overall travel times remain normal for this time of day.

  77. 3:17 AMConstruction

    As of 3:25 a.m. on Wednesday, March 25th, traffic is moving normally with no reported backups or delays. Current operations are limited to one lane eastbound and one lane westbound. The eastbound bridge is closed for road work, and the center lane on the westbound bridge remains closed as a buffer lane. Traffic should maintain a safe following distance to avoid rear-end collisions.

  78. 3:12 AMBridge closed

    Traffic is currently clear with no backups or delays. As of 3:20 a.m. on Wednesday, March 25th, the eastbound bridge is closed for road work. All traffic is being diverted to the westbound bridge, which is operating with one lane in each direction. The center lane on the westbound bridge is closed as a buffer.

  79. 3:07 AMBridge closed

    As of 3:15 a.m. on Wednesday, March 25th, traffic is currently clear with no backups or delays. Travel times remain normal in both directions. The eastbound bridge is closed for road work, with all traffic diverted to the westbound bridge. Currently, the westbound bridge is operating with one lane in each direction while the center lane remains closed as a buffer.

  80. 2:52 AMConstruction

    As of 3 a.m. on Wednesday, March 25th, there are no backups or delays and travel times remain normal. The eastbound bridge is currently closed for road work, and traffic is being shifted to the westbound span. Both eastbound and westbound traffic are limited to one lane each, with the center lane on the westbound bridge closed as a buffer.

  81. 2:52 AMConstruction

    As of 3 a.m. on Wednesday, March 25th, there are no backups or delays and travel times remain normal. The eastbound bridge is currently closed for road work, and traffic is being shifted to the westbound span. Both eastbound and westbound traffic are limited to one lane each, with the center lane on the westbound bridge closed as a buffer.

  82. 2:37 AMConstruction

    As of 2:45 a.m. on Wednesday, March 25th, there are no backups or delays on or approaching the Bay Bridge. Traffic flow remains normal in both directions.

    The eastbound bridge is currently closed for road work. All traffic is being diverted to the westbound bridge, which is operating with one lane open in each direction. The center lane of the westbound bridge is closed to serve as a buffer.

  83. 2:32 AMBridge closed

    Traffic is currently clear with no backups or delays. Due to road work, the eastbound bridge is closed, and traffic is restricted to one lane in each direction on the westbound bridge. The center lane of the westbound bridge is also closed as a buffer.

  84. 2:27 AMBridge closed

    As of 2:35 a.m. on Wednesday, March 25th, there are no backups or delays on or approaching the bridge, and travel times are normal in both directions. The eastbound bridge is closed for roadwork, with traffic currently shifted to the westbound bridge. This configuration provides one lane for eastbound traffic and one lane for westbound traffic, while the center lane remains closed as a buffer.

  85. 2:12 AMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge. Traffic flow is normal as of 2:20 a.m. Wednesday. Due to road work, the eastbound bridge is closed. All traffic is being diverted to the westbound bridge, which is operating with one lane open for each direction and the center lane closed as a buffer.

  86. 2:12 AMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge. Traffic flow is normal as of 2:20 a.m. Wednesday. Due to road work, the eastbound bridge is closed. All traffic is being diverted to the westbound bridge, which is operating with one lane open for each direction and the center lane closed as a buffer.

  87. 1:57 AMConstruction

    As of 2:05 a.m. on Wednesday, March 25th, there are no backups or delays on or approaching the bridge, and traffic is flowing at normal speeds. The eastbound bridge is currently closed for road work. All traffic is being diverted to the westbound bridge, which is operating with one lane for eastbound travel and one lane for westbound travel. The center lane on the westbound bridge is closed for use as a buffer.

  88. 1:42 AMConstruction

    Traffic is currently moving normally with no backups or delays. As of 1:50 a.m. on Wednesday, March 25th, the eastbound bridge is closed for roadwork. All traffic is being shifted to the westbound bridge, which is operating with one lane open in each direction. The center lane on the westbound bridge is also closed to serve as a buffer.

  89. 1:42 AMConstruction

    Traffic is currently moving normally with no backups or delays. As of 1:50 a.m. on Wednesday, March 25th, the eastbound bridge is closed for roadwork. All traffic is being shifted to the westbound bridge, which is operating with one lane open in each direction. The center lane on the westbound bridge is also closed to serve as a buffer.

  90. 1:27 AMConstruction

    Traffic is currently clear with no backups or delays. Travel times in both directions are normal. The eastbound bridge is closed for roadwork, so traffic is limited to one lane in each direction on the westbound bridge. The center lane on the westbound bridge is also closed to serve as a buffer.

  91. 1:27 AMConstruction

    Traffic is currently clear with no backups or delays. Travel times in both directions are normal. The eastbound bridge is closed for roadwork, so traffic is limited to one lane in each direction on the westbound bridge. The center lane on the westbound bridge is also closed to serve as a buffer.

  92. 12:57 AMConstruction

    Traffic is currently clear with no backups or delays as of 1:05 a.m. on Wednesday, March 25th. The eastbound bridge is closed for road work, and the center lane on the westbound bridge is closed as a buffer. Consequently, traffic is restricted to one lane in each direction. Travel times remain normal.

  93. 12:42 AMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge. Traffic is moving at normal speeds in both directions. The eastbound bridge is closed for roadwork, and all traffic is being diverted to the westbound bridge. The westbound bridge is operating with one lane for eastbound traffic and one lane for westbound traffic, with the center lane closed as a buffer.

  94. 12:27 AMConstruction

    As of 12:35 a.m. on Wednesday, March 25th, there are currently no backups or delays on or approaching the bridge. Traffic is flowing at normal durations despite construction-related lane closures. The eastbound bridge is entirely closed for roadwork, resulting in two-way traffic on the westbound bridge. Only one lane is open for eastbound travel and one lane for westbound travel, with the center lane on the westbound bridge closed to act as a buffer.

  95. 12:12 AMConstruction

    As of 12:20 a.m. on Wednesday, March 25th, there are no backups or delays at the Bay Bridge, and travel times remain normal. The eastbound bridge is closed for road work, and traffic is currently restricted to one lane in each direction on the westbound bridge. Additionally, the center lane on the westbound bridge is closed to serve as a buffer.