Live statusBay Bridge Status

Status history

Look up any past day on the Chesapeake Bay Bridge — closures, advisories, and BaySpan recordings.

March 2026

Friday, March 20, 2026

Jump to today

95 updates logged

  1. 11:58 PMWind advisory

    Traffic is currently clear with no delays in either direction. The bridge is operating under a wind warning with sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other wind-vulnerable vehicles should use caution while crossing.

  2. 11:57 PMWind advisory

    Traffic is currently clear with no delays in either direction. The bridge is operating under a wind warning with sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other wind-vulnerable vehicles should use caution while crossing.

  3. 11:42 PMWind advisory

    There are no delays at the Bay Bridge in either direction, and traffic is currently flowing at normal speeds. The bridge is operating under wind warnings due to sustained wind speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other high-profile vehicles should exercise caution while crossing.

  4. 11:27 PMWind advisory

    Traffic is currently clear with normal travel times in both directions. The bridge is operating under a wind warning, with sustained wind speeds measured between 30 and 39 mph. Drivers of box trailers, house trailers, and other wind-vulnerable vehicles should exercise caution while crossing.

  5. 11:12 PMWind advisory

    There are no delays at the Bay Bridge in either direction. The bridge is currently operating under a wind warning with sustained speeds between 30 and 39 mph. House trailers, box trailers, and other vehicles vulnerable to high winds should use caution when crossing.

  6. 11:12 PMWind advisory

    There are no delays at the Bay Bridge in either direction. The bridge is currently operating under a wind warning with sustained speeds between 30 and 39 mph. House trailers, box trailers, and other vehicles vulnerable to high winds should use caution when crossing.

  7. 10:57 PMWind advisory

    There are no delays at the Bay Bridge in either direction, and traffic is currently flowing at normal speeds. The bridge is operating under a wind warning with sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other vehicles vulnerable to high winds should exercise extra caution when crossing.

  8. 10:42 PMWind advisory

    Traffic is moving normally with no delays reported in either direction for Friday evening. The bridge is currently operating under a wind warning due to sustained speeds between 30 and 39 mph. Drivers of box trailers, house trailers, and other wind-vulnerable vehicles should exercise caution during the crossing.

  9. 10:27 PMWind advisory

    There are currently no delays at the Bay Bridge in either direction. The bridge is operating under wind warnings with sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other vehicles vulnerable to high winds should exercise caution when crossing.

  10. 10:12 PMWind advisory

    Traffic is currently clear with no delays in either direction. The bridge is operating under a wind warning with sustained speeds between 30 and 39 mph. Drivers of box trailers, house trailers, and other vehicles vulnerable to high winds should use caution when crossing.

  11. 9:57 PMWind advisory

    Traffic is currently clear in both directions. A wind warning is in effect with sustained speeds between 30 and 39 mph. Drivers of high-profile vehicles, including house and box trailers, should exercise caution while crossing the bridge.

  12. 9:42 PMWind advisory

    There are currently no delays in either direction at the Bay Bridge, and traffic is flowing at normal speeds. The bridge is operating under a wind warning with sustained wind speeds between 30 and 39 mph. Operators of house trailers, box trailers, and other vehicles vulnerable to high winds should use caution during the crossing.

  13. 9:27 PMWind advisory

    As of 9:36 PM on Friday, March 20th, there are no delays on the Bay Bridge in either direction, with traffic moving at normal speeds. The bridge is currently operating under a wind warning with sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other high-profile vehicles should exercise caution while crossing.

  14. 9:13 PMWind advisory

    There are no delays at the Bay Bridge in either direction, and traffic is flowing at normal speeds. However, the bridge is currently operating under wind warnings with sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other high-profile vehicles should exercise caution when crossing.

  15. 9:12 PMWind advisory

    There are no delays at the Bay Bridge in either direction, and traffic is flowing at normal speeds. However, the bridge is currently operating under wind warnings with sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other high-profile vehicles should exercise caution when crossing.

  16. 8:57 PMWind advisory

    Traffic is flowing normally with no delays reported in either direction at the Bay Bridge. However, the bridge is currently under a wind warning, with sustained wind speeds between 30 and 39 miles per hour. Drivers of house trailers, box trailers, and other vehicles vulnerable to high winds should exercise extra caution during the crossing and maintain a safe following distance from other vehicles.

  17. 8:42 PMWind advisory

    Traffic is currently clear with no delays at the Bay Bridge in either direction. The bridge is operating under a wind warning with sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other high-profile vehicles should exercise caution while crossing.

  18. 8:28 PMWind advisory

    Traffic is currently clear with no delays in either direction. The bridge is operating under wind warnings, with sustained wind speeds between 30 and 39 miles per hour. Drivers of house trailers, box trailers, and other vehicles vulnerable to high winds should exercise extra caution during the crossing.

  19. 8:27 PMWind advisory

    Traffic is currently clear with no delays in either direction. The bridge is operating under wind warnings, with sustained wind speeds between 30 and 39 miles per hour. Drivers of house trailers, box trailers, and other vehicles vulnerable to high winds should exercise extra caution during the crossing.

  20. 8:12 PMWind advisory

    There are no delays at the Bay Bridge in either direction, and traffic is flowing at normal speeds. The bridge is currently operating under wind warnings with sustained wind speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other vehicles vulnerable to high winds should exercise caution while crossing.

  21. 7:57 PMWind advisory

    There are currently no delays at the Bay Bridge in either direction, and traffic is flowing at normal speeds. The bridge is operating under a wind warning with sustained speeds between 30 and 39 miles per hour. Drivers of house trailers, box trailers, and other vehicles vulnerable to high winds should exercise caution while crossing.

  22. 7:43 PMWind advisory

    Traffic is currently moving normally with no delays in either direction. The bridge is operating under a wind warning due to sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other vehicles vulnerable to high winds should use caution when crossing.

  23. 7:43 PMWind advisory

    Traffic is currently moving normally with no delays in either direction. The bridge is operating under a wind warning due to sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other vehicles vulnerable to high winds should use caution when crossing.

  24. 7:28 PMWind advisory

    There are currently no backups or delays in either direction on the Bay Bridge. While the left lane is closed to prepare for two-way traffic, operations remain normal. A wind warning is in effect with sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other vehicles vulnerable to high winds should use caution when crossing. Two-way traffic patterns are not currently in effect.

  25. 7:28 PMWind advisory

    There are currently no backups or delays in either direction on the Bay Bridge. While the left lane is closed to prepare for two-way traffic, operations remain normal. A wind warning is in effect with sustained speeds between 30 and 39 mph. Drivers of house trailers, box trailers, and other vehicles vulnerable to high winds should use caution when crossing. Two-way traffic patterns are not currently in effect.

  26. 7:13 PMWind advisory

    Traffic is currently clear with no backups or delays in either direction. Travel times remain normal, even though the left lane is closed to prepare for two-way operations. A wind warning is in effect with sustained speeds between 30 and 39 mph; drivers of house trailers, box trailers, and other high-profile vehicles should exercise caution while crossing. Two-way traffic flow is not currently in effect.

  27. 6:58 PMWind advisory

    Eastbound traffic is currently delayed starting at Exit 31 (Whitehall Road), roughly 1.5 miles from the bridge. Westbound travel remains normal despite a left lane closure. A wind warning is in effect with sustained speeds between 30 and 39 mph, so drivers of house trailers, box trailers, and other high-profile vehicles should exercise caution while crossing. Two-way traffic operations are not currently in place.

  28. 6:43 PMWind advisory

    Eastbound traffic is experiencing a three-mile delay beginning at Exit 29b (Cape Saint Claire Road). Westbound traffic is currently normal, though the left lane remains closed to prepare for two-way operations. The bridge is under a wind warning with sustained speeds between 30 and 39 mph, so drivers of house trailers, box trailers, and other high-profile vehicles should use caution while crossing.

  29. 6:28 PMWind advisory

    Eastbound traffic is experiencing a three-mile delay starting at Exit 29B (Cape Saint Claire Road). Westbound travel remains normal, though the left lane is closed for two-way traffic preparation. The bridge is currently under a wind warning with sustained speeds between 30 and 39 mph, so house trailers, box trailers, and other wind-vulnerable vehicles should exercise caution. Two-way traffic operations are not currently in effect.

  30. 6:28 PMWind advisory

    Eastbound traffic is experiencing a three-mile delay starting at Exit 29B (Cape Saint Claire Road). Westbound travel remains normal, though the left lane is closed for two-way traffic preparation. The bridge is currently under a wind warning with sustained speeds between 30 and 39 mph, so house trailers, box trailers, and other wind-vulnerable vehicles should exercise caution. Two-way traffic operations are not currently in effect.

  31. 6:13 PMWind advisory

    Eastbound traffic is currently delayed for three miles starting at Exit 29b (Cape Saint Claire Road). Westbound traffic is moving normally with no delays. The bridge is under a wind warning with sustained speeds between 30 and 39 mph, so house trailers, box trailers, and other wind-vulnerable vehicles should use caution. Although the left lane is closed for traffic preparation, two-way operations are not currently in effect.

  32. 5:58 PMWind advisory

    Eastbound traffic is currently experiencing a 3.5-mile backup beginning at Exit 29a (Bush Frontage Road). Westbound traffic remains clear, even with the left lane closed to prepare for two-way operations. The bridge is under a wind warning with sustained speeds between 30 and 39 mph, so those driving house trailers, box trailers, or other high-profile vehicles should use caution. Two-way traffic operations are not currently in effect.

  33. 5:58 PMWind advisory

    Eastbound traffic is currently experiencing a 3.5-mile backup beginning at Exit 29a (Bush Frontage Road). Westbound traffic remains clear, even with the left lane closed to prepare for two-way operations. The bridge is under a wind warning with sustained speeds between 30 and 39 mph, so those driving house trailers, box trailers, or other high-profile vehicles should use caution. Two-way traffic operations are not currently in effect.

  34. 5:43 PMWind advisory

    Eastbound traffic is currently experiencing delays starting at Exit 29a (Bush Frontage Road), approximately 3.5 miles from the bridge. Westbound traffic remains clear, even with the left lane closed for two-way traffic preparation. A wind warning is in effect with sustained speeds between 30 and 39 mph, so house trailers, box trailers, and other wind-vulnerable vehicles should use caution. Two-way traffic operations are not currently in effect.

  35. 5:28 PMWind advisory

    Eastbound traffic is currently experiencing a 3.5-mile backup starting at Exit 29a (Bush Frontage Road). Westbound traffic is moving normally, although the left lane is closed to prepare for two-way travel. The bridge is under a wind warning with sustained speeds between 30 and 39 mph; drivers of house trailers, box trailers, and other high-profile vehicles should use extra caution. Bridge officials have not yet implemented two-way traffic operations due to these conditions.

  36. 5:18 PMWind advisory

    Eastbound traffic is currently experiencing delays starting at Exit 29a (Bush Frontage Road), roughly 3.5 miles from the bridge. Westbound traffic remains clear, though the left lane is closed to prepare for two-way operations. Two-way traffic is not currently in effect. Drivers should also be aware of a wind warning with sustained speeds between 30 and 39 mph; house trailers, box trailers, and other wind-vulnerable vehicles should use caution when crossing.

  37. 5:03 PMWind advisory

    Eastbound traffic is currently experiencing a three-mile delay beginning at Exit 29b (Cape Saint Claire Road). Westbound traffic remains clear and is moving at normal speeds, even with the left lane closed. The bridge is under a wind warning with sustained speeds between 30 and 39 mph; drivers of house trailers, box trailers, and other high-profile vehicles should use caution while crossing. Two-way traffic operations are not in effect at this time.

  38. 5:03 PMWind advisory

    Eastbound traffic is currently experiencing a three-mile delay beginning at Exit 29b (Cape Saint Claire Road). Westbound traffic remains clear and is moving at normal speeds, even with the left lane closed. The bridge is under a wind warning with sustained speeds between 30 and 39 mph; drivers of house trailers, box trailers, and other high-profile vehicles should use caution while crossing. Two-way traffic operations are not in effect at this time.

  39. 4:48 PMWind advisory

    Eastbound traffic is currently delayed for three miles, with congestion starting at Exit 29b (Cape Saint Claire Road). Westbound traffic is moving normally, though the left lane is closed to prepare for two-way operations. A wind warning is in effect with sustained speeds between 30 and 39 mph, and drivers of house trailers, box trailers, or other high-profile vehicles should use extra caution. Two-way traffic is not currently in effect.

  40. 4:48 PMWind advisory

    Eastbound traffic is currently delayed for three miles, with congestion starting at Exit 29b (Cape Saint Claire Road). Westbound traffic is moving normally, though the left lane is closed to prepare for two-way operations. A wind warning is in effect with sustained speeds between 30 and 39 mph, and drivers of house trailers, box trailers, or other high-profile vehicles should use extra caution. Two-way traffic is not currently in effect.

  41. 4:33 PMWind advisory

    Eastbound traffic is currently backed up for 2.5 miles starting at Exit 30. Westbound travel remains normal despite a left lane closure. A wind warning is in effect with sustained speeds between 30 and 39 mph, so high-profile vehicles and trailers should use caution while crossing. Two-way traffic operations are not currently being utilized.

  42. 4:18 PMWind advisory

    Traffic is currently clear with no backups or delays in either direction. Although the westbound left lane is closed to discontinue two-way traffic, flow remains normal. A wind warning is in effect with sustained speeds between 30 and 39 mph; drivers of house trailers, box trailers, and other wind-vulnerable vehicles should use caution during the crossing.

  43. 3:17 PMAll clear

    There are currently no delays in either direction. As of 3:26 p.m. on Friday, March 20th, the bridge is operating with three lanes open eastbound and two lanes westbound.

  44. 3:17 PMAll clear

    There are currently no delays in either direction. As of 3:26 p.m. on Friday, March 20th, the bridge is operating with three lanes open eastbound and two lanes westbound.

  45. 3:02 PMTraffic advisory

    Eastbound traffic is experiencing a 1.5-mile backup starting at Exit 31 (Whitehall Road). There are currently three lanes open eastbound and two lanes open westbound. Westbound traffic remains normal with no reported delays.

  46. 3:02 PMTraffic advisory

    Eastbound traffic is experiencing a 1.5-mile backup starting at Exit 31 (Whitehall Road). There are currently three lanes open eastbound and two lanes open westbound. Westbound traffic remains normal with no reported delays.

  47. 2:47 PMTraffic advisory

    Eastbound traffic is experiencing delays beginning at Exit 31 (Whitehall Road), which is approximately 1.5 miles from the bridge. Westbound traffic is currently clear. There are three lanes open eastbound and two lanes open westbound.

  48. 2:32 PMTraffic advisory

    As of 2:41 p.m. on Friday, March 20th, eastbound traffic is experiencing delays starting at exit 31 (Whitehall Road), roughly 1.5 miles from the bridge. Westbound travel is currently clear with no reported delays. There are three lanes open eastbound and two lanes open westbound.

  49. 2:18 PMWind advisory

    Eastbound traffic is currently experiencing delays starting at Exit 32 (Sandy Point), roughly one mile from the bridge. Westbound traffic is moving normally, even with the left lane closed to prepare for two-way travel. The bridge is under a wind warning with sustained speeds between 30 and 39 mph, so those driving box trailers, house trailers, or other wind-vulnerable vehicles should use extra caution.

  50. 1:17 PMAll clear

    As of Friday, March 20th at 1:26 p.m., traffic is clear with no delays in either direction. There are currently three lanes open eastbound and two lanes open westbound.

  51. 12:17 PMAll clear

    As of 12:26 p.m. on Friday, March 20th, traffic is moving at normal speeds with no delays in either direction. The bridge is currently operating with three lanes open eastbound and two lanes open westbound.

  52. 12:02 PMConstruction

    As of 12:11 PM on Friday, March 20, there are currently no backups or delays in either direction at the Bay Bridge. While traffic is flowing at normal speeds both eastbound and westbound, the westbound left lane is closed to prepare for two-way traffic operations.

  53. 12:02 PMConstruction

    As of 12:11 PM on Friday, March 20, there are currently no backups or delays in either direction at the Bay Bridge. While traffic is flowing at normal speeds both eastbound and westbound, the westbound left lane is closed to prepare for two-way traffic operations.

  54. 11:47 AMConstruction

    As of Friday, March 20th, at 11:56 a.m., there are no backups or delays on the Bay Bridge in either direction. Traffic is flowing normally for both eastbound and westbound motorists. While the westbound left lane is currently closed for two-way traffic preparation, it is not impacting travel times.

  55. 11:33 AMConstruction

    There are currently no backups or delays on the Bay Bridge in either direction. Traffic is flowing at normal speeds both eastbound and westbound. The westbound left lane is closed for two-way traffic preparation, though this is not impacting travel times.

  56. 11:17 AMConstruction

    As of Friday, March 20th, at 11:26 a.m., traffic is flowing normally with no backups or delays in either direction on the Bay Bridge. While the westbound left lane is currently closed to prepare for two-way traffic, travel times remain unaffected and consistent with typical conditions.

  57. 11:17 AMConstruction

    As of Friday, March 20th, at 11:26 a.m., traffic is flowing normally with no backups or delays in either direction on the Bay Bridge. While the westbound left lane is currently closed to prepare for two-way traffic, travel times remain unaffected and consistent with typical conditions.

  58. 11:03 AMConstruction

    There are currently no backups on or approaching the Bay Bridge in either direction. As of Friday, March 20th, at 11:11 AM, traffic is flowing normally both eastbound and westbound. Travelers should note that the left lane on the bridge is closed to prepare for two-way traffic. Maintain a safe distance from the vehicle in front of you to avoid rear-end collisions.

  59. 11:03 AMConstruction

    There are currently no backups on or approaching the Bay Bridge in either direction. As of Friday, March 20th, at 11:11 AM, traffic is flowing normally both eastbound and westbound. Travelers should note that the left lane on the bridge is closed to prepare for two-way traffic. Maintain a safe distance from the vehicle in front of you to avoid rear-end collisions.

  60. 10:47 AMConstruction

    There are currently no backups or delays approaching the Bay Bridge in either direction. As of 10:56 a.m. on Friday, March 20th, traffic is moving at normal speeds for both eastbound and westbound travelers. Although the westbound left lane is closed to prepare for two-way traffic, the closure is not causing any impact on the flow of traffic.

  61. 10:47 AMConstruction

    There are currently no backups or delays approaching the Bay Bridge in either direction. As of 10:56 a.m. on Friday, March 20th, traffic is moving at normal speeds for both eastbound and westbound travelers. Although the westbound left lane is closed to prepare for two-way traffic, the closure is not causing any impact on the flow of traffic.

  62. 10:32 AMConstruction

    Traffic is currently clear with no backups or delays in either direction. Both eastbound and westbound flows are normal for Friday morning. The left lane is closed for two-way traffic preparation.

  63. 10:32 AMConstruction

    Traffic is currently clear with no backups or delays in either direction. Both eastbound and westbound flows are normal for Friday morning. The left lane is closed for two-way traffic preparation.

  64. 10:17 AMConstruction

    As of 10:26 a.m. on Friday, March 20th, there are no backups or delays approaching the Bay Bridge in either direction. Traffic is flowing at normal speeds both eastbound and westbound. Note that the westbound left lane is currently closed to prepare for two-way traffic operations.

  65. 10:02 AMConstruction

    As of 10:11 a.m. on Friday, March 20th, there are currently no backups or delays in either direction on the Bay Bridge. Traffic is moving at normal speeds for both eastbound and westbound travel. The left lane on the westbound bridge is closed for two-way traffic preparation.

  66. 9:47 AMConstruction

    As of 9:56 a.m. on Friday, there are currently no backups or delays on the Bay Bridge in either direction. While traffic is moving at normal speeds, the westbound left lane is closed to prepare for two-way traffic operations.

  67. 9:32 AMConstruction

    As of 9:41 a.m. on Friday, March 20th, there are no backups or delays in either direction on the Bay Bridge. Traffic is moving normally both eastbound and westbound. While the left lane is currently closed to prepare for two-way traffic, this is not impacting travel times.

  68. 9:32 AMConstruction

    As of 9:41 a.m. on Friday, March 20th, there are no backups or delays in either direction on the Bay Bridge. Traffic is moving normally both eastbound and westbound. While the left lane is currently closed to prepare for two-way traffic, this is not impacting travel times.

  69. 8:32 AMAll clear

    As of 8:41 a.m. on Friday, March 20, there are no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds.

    For those traveling later this weekend, the best times to head out are before 10 a.m. and after 10 p.m. on Friday and Sunday. On Saturday, plan to cross the bridge before 7 a.m. or after 5 p.m. to avoid the heaviest volume.

  70. 7:32 AMAll clear

    There are no backups approaching the Bay Bridge in either direction as of 7:41 a.m. Friday, March 20th, with traffic currently maintaining normal travel times. To avoid potential delays later this weekend, the best times to travel are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

  71. 6:33 AMAll clear

    Currently, there are no backups approaching the Bay Bridge in either direction, and traffic flow remains normal. For those traveling throughout the weekend, the best times to cross on Friday are before 10 a.m. and after 10 p.m. Optimal Saturday travel times are before 7 a.m. and after 5 p.m., while Sunday is best before 10 a.m. and after 10 p.m.

  72. 5:32 AMAll clear

    There are currently no backups approaching the bridge in either direction, with traffic moving at normal travel speeds. For those traveling over the weekend, the best times to avoid congestion on Friday are before 10 a.m. or after 10 p.m. On Saturday, plan to cross before 7 a.m. or after 5 p.m., and on Sunday, travel before 10 a.m. or after 10 p.m.

  73. 4:33 AMAll clear

    Traffic is currently clear with no backups approaching the Bay Bridge in either direction. For the remainder of the weekend, the best times to travel are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

  74. 4:33 AMAll clear

    Traffic is currently clear with no backups approaching the Bay Bridge in either direction. For the remainder of the weekend, the best times to travel are Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

  75. 4:17 AMIssue reported

    There are currently no traffic backups or delays in either direction on the Bay Bridge as of 4:26 a.m. on Friday, March 20th. Travel times are normal for both eastbound and westbound commuters. The westbound left lane is currently closed to discontinue two-way traffic flow.

  76. 4:02 AMIssue reported

    There are currently no backups or delays on or approaching the Bay Bridge. As of 4:12 a.m. on Friday, March 20th, traffic is flowing at normal durations. The bridge is operating with one lane westbound and three lanes eastbound, as the center lane on the westbound bridge is closed to discontinue two-way traffic.

  77. 3:47 AMConstruction

    Traffic is currently clear with no backups or delays on or approaching the bridge. All traffic is being shifted to the westbound bridge, which is operating with one lane open in each direction. The eastbound bridge is completely closed for road work, and the center lane on the westbound bridge is also closed to serve as a buffer. Traffic flow remains normal for this time of day.

  78. 3:33 AMConstruction

    As of Friday, March 20th, at 3:41 a.m., there are no backups or delays on or approaching the Bay Bridge, with traffic maintaining normal travel times. The eastbound bridge is currently closed for roadwork. Consequently, the bridge is operating with two-way traffic on the westbound span, consisting of one lane eastbound and one lane westbound. The center lane of the westbound bridge is closed to serve as a buffer.

  79. 3:33 AMConstruction

    As of Friday, March 20th, at 3:41 a.m., there are no backups or delays on or approaching the Bay Bridge, with traffic maintaining normal travel times. The eastbound bridge is currently closed for roadwork. Consequently, the bridge is operating with two-way traffic on the westbound span, consisting of one lane eastbound and one lane westbound. The center lane of the westbound bridge is closed to serve as a buffer.

  80. 3:17 AMConstruction

    As of 3:26 a.m. on Friday, March 20th, there are no backups or delays on or approaching the bridge. Traffic is moving at normal speeds, though the eastbound bridge is closed for road work. All traffic is currently being diverted to the westbound bridge, which is operating with one lane in each direction and a center buffer lane.

  81. 3:03 AMConstruction

    Currently, there are no backups or delays on or approaching the Bay Bridge. As of 3:12 a.m. on Friday, March 20th, traffic is flowing at normal speeds in both directions. The eastbound bridge is closed for roadwork, and traffic is being diverted to the westbound bridge. Currently, the bridge is operating with one lane open for eastbound travel and one lane for westbound travel, while the center lane remains closed as a buffer.

  82. 3:03 AMConstruction

    Currently, there are no backups or delays on or approaching the Bay Bridge. As of 3:12 a.m. on Friday, March 20th, traffic is flowing at normal speeds in both directions. The eastbound bridge is closed for roadwork, and traffic is being diverted to the westbound bridge. Currently, the bridge is operating with one lane open for eastbound travel and one lane for westbound travel, while the center lane remains closed as a buffer.

  83. 2:47 AMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge, with traffic flow remaining normal in both directions. The eastbound bridge is closed for roadwork, resulting in a traffic pattern of one lane eastbound and one lane westbound on the westbound bridge. The center lane of the westbound bridge is also closed to serve as a buffer.

  84. 2:33 AMConstruction

    Traffic is currently clear with no backups or delays. As of 2:42 a.m., travel times remain normal. The eastbound bridge is closed for road work, and all traffic is being diverted to the westbound bridge. Currently, the bridge is operating with one lane open in each direction, and the center lane on the westbound bridge is closed as a buffer.

  85. 2:33 AMConstruction

    Traffic is currently clear with no backups or delays. As of 2:42 a.m., travel times remain normal. The eastbound bridge is closed for road work, and all traffic is being diverted to the westbound bridge. Currently, the bridge is operating with one lane open in each direction, and the center lane on the westbound bridge is closed as a buffer.

  86. 2:17 AMConstruction

    Traffic is currently clear with no backups or delays. Travel is restricted to one lane in each direction. The eastbound bridge is closed for road work, and the westbound bridge has its center lane closed for a buffer lane.

  87. 2:03 AMConstruction

    There are currently no backups or delays on or approaching the bridge. Traffic is flowing normally with one lane open in each direction. All travel is restricted to the westbound bridge, as the eastbound bridge is closed for road work. The center lane on the westbound span is also closed as a buffer.

  88. 1:47 AMConstruction

    Traffic is currently clear with no backups or delays. As of 1:56 a.m. on Friday, March 20th, the eastbound bridge is closed for road work. All traffic is being shifted to the westbound bridge, which is operating with one lane in each direction. The center lane on the westbound bridge is also closed as a buffer. Travel times remain normal despite the lane closures.

  89. 1:33 AMConstruction

    Traffic is currently clear with no backups or delays. Travel times are normal in both directions. The eastbound bridge is closed for roadwork, and traffic is being diverted into a two-way, single-lane configuration on the westbound bridge. The center lane of the westbound span is also closed to serve as a buffer.

  90. 1:18 AMConstruction

    Traffic is currently clear with no backups or delays on or approaching the bridge. The eastbound bridge is closed for road work, and the center lane of the westbound bridge is closed for a buffer. As a result, the bridge is operating with one lane of traffic in each direction. Travel times remain normal.

  91. 1:03 AMConstruction

    As of 1:12 a.m. on Friday, March 20th, there are no backups or delays on or approaching the Bay Bridge, and traffic is moving at normal speeds. The bridge is currently limited to one lane of travel in each direction. The eastbound bridge is closed for road work, while the center lane on the westbound bridge is closed to serve as a buffer.

  92. 12:47 AMConstruction

    Traffic is currently clear with no backups or delays approaching the Bay Bridge. As of 12:56 a.m. Friday, travel times remain normal in both directions. The eastbound bridge is closed for road work, and the center lane of the westbound bridge is closed for use as a buffer. Consequently, the bridge is operating with one lane of traffic open for each direction.

  93. 12:28 AMConstruction

    As of 12:36 a.m. on Friday, March 20th, there are no backups or delays currently on or approaching the Bay Bridge, and traffic is moving at normal speeds. The eastbound bridge is closed for road work, and the center lane of the westbound bridge is closed as a buffer. Consequently, traffic is operating with only one lane open in each direction.

  94. 12:27 AMConstruction

    As of 12:36 a.m. on Friday, March 20th, there are no backups or delays currently on or approaching the Bay Bridge, and traffic is moving at normal speeds. The eastbound bridge is closed for road work, and the center lane of the westbound bridge is closed as a buffer. Consequently, traffic is operating with only one lane open in each direction.

  95. 12:12 AMConstruction

    Traffic is currently clear with no backups or delays on or approaching the Bay Bridge. Travel times are normal in both directions. The eastbound bridge is closed for road work, with traffic reduced to one lane eastbound and one lane westbound on the westbound bridge. The center lane on the westbound bridge is also closed to serve as a buffer.