Live statusBay Bridge Status

Status history

Look up any past day on the Chesapeake Bay Bridge — closures, advisories, and BaySpan recordings.

March 2026

Wednesday, March 18, 2026

Jump to today

92 updates logged

  1. 11:48 PMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge. Traffic is flowing normally, though it is restricted to one lane in each direction. The eastbound bridge is closed for roadwork, and the center lane on the westbound bridge is closed to serve as a buffer.

  2. 11:33 PMConstruction

    As of 11:40 PM on Wednesday, March 18th, there are no backups or delays currently affecting the bridge. Traffic flow remains normal in both directions. The eastbound bridge is closed for maintenance, resulting in a two-way traffic configuration on the westbound bridge with one lane open for each direction. Additionally, the center lane on the westbound bridge is closed to serve as a buffer.

  3. 11:18 PMConstruction

    As of 11:27 PM on Wednesday, March 18th, there are no backups or delays on or approaching the Bay Bridge, and traffic is flowing at normal speeds. The eastbound bridge is currently closed for road work, shifting all traffic to the westbound bridge. Travel is limited to one lane eastbound and one lane westbound, with the center lane closed to serve as a buffer.

  4. 11:03 PMConstruction

    Traffic is moving normally across the Bay Bridge. The eastbound bridge is closed for roadwork, shifting all travel to the westbound bridge. Currently, there is only one lane open in each direction, with the center lane closed as a buffer.

  5. 10:48 PMConstruction

    Traffic is currently moving normally with no backups or delays. As of Wednesday at 10:57 p.m., the eastbound bridge is closed for road work. All traffic is sharing the westbound bridge, which is operating with one lane in each direction. The center lane of the westbound bridge is closed to serve as a buffer.

  6. 10:33 PMConstruction

    As of 10:40 PM on Wednesday, March 18th, there are currently no backups or delays on or approaching the bridge. Traffic is flowing normally in both directions.

    The eastbound bridge is closed for roadwork. Consequently, the bridge is operating under a two-way traffic configuration with one lane open eastbound and one lane open westbound. Additionally, the center lane on the westbound bridge is closed to serve as a buffer.

  7. 10:33 PMConstruction

    As of 10:40 PM on Wednesday, March 18th, there are currently no backups or delays on or approaching the bridge. Traffic is flowing normally in both directions.

    The eastbound bridge is closed for roadwork. Consequently, the bridge is operating under a two-way traffic configuration with one lane open eastbound and one lane open westbound. Additionally, the center lane on the westbound bridge is closed to serve as a buffer.

  8. 10:23 PMConstruction

    Traffic is currently clear with no backups or delays. The eastbound bridge is closed for road work, and the center lane of the westbound bridge is closed as a buffer. Consequently, traffic is limited to one lane eastbound and one lane westbound on the westbound bridge.

  9. 10:18 PMBridge closed

    Traffic is moving normally with no backups or delays currently reported on or approaching the bridge. The eastbound bridge is closed for road work, and all traffic is being diverted to the westbound bridge. Travel is limited to one lane eastbound and one lane westbound, with the center lane on the westbound bridge closed to serve as a buffer.

  10. 10:03 PMConstruction

    Traffic is currently clear with no backups or delays in either direction. The eastbound bridge is closed for road work, and all traffic is being diverted to the westbound span. Current operations are limited to one lane eastbound and one lane westbound, with the center lane closed as a buffer. Travel times remain normal.

  11. 9:53 PMConstruction

    As of Wednesday, March 18th at 10:02 p.m., there are currently no backups or delays on or approaching the Bay Bridge. The eastbound bridge is closed for roadwork, and all traffic is shifted to the westbound bridge. This configuration provides one lane for eastbound travel and one lane for westbound travel, with the center lane closed as a buffer. Traffic flow remains normal for these conditions.

  12. 9:38 PMConstruction

    There are no current backups or delays, but eastbound traffic is taking 19 minutes compared to the usual 10-minute duration. The eastbound bridge is closed for road work, with traffic funneled into one lane in each direction on the westbound span. The center lane on the westbound bridge is also closed as a buffer. While the eastbound trip is significantly slower than normal, westbound traffic is moving at a typical 7-minute pace.

  13. 9:38 PMConstruction

    As of 9:47 p.m. Wednesday, March 18th, eastbound traffic is delayed while westbound travel remains normal. The eastbound bridge is closed for road work. Traffic is currently restricted to one lane in each direction on the westbound bridge, with the center lane closed as a buffer.

  14. 9:33 PMBridge closed

    Eastbound traffic is experiencing delays starting at Exit 32 Sandy Point while westbound traffic remains normal. The eastbound bridge is closed for roadwork, and the center lane on the westbound bridge is closed as a buffer. Traffic is currently restricted to one lane in each direction.

  15. 9:33 PMTraffic advisory

    Eastbound traffic is experiencing delays starting at Exit 32 Sandy Point while westbound traffic remains normal. The eastbound bridge is closed for roadwork, and the center lane on the westbound bridge is closed as a buffer. Traffic is currently restricted to one lane in each direction.

  16. 9:18 PMTraffic advisory

    Eastbound traffic is experiencing delays beginning at Exit 30 because the eastbound bridge is closed for roadwork. Both eastbound and westbound traffic are currently restricted to one lane each, with the center lane closed as a buffer. Westbound traffic is currently normal with no delays.

  17. 9:03 PMTraffic advisory

    Eastbound traffic is experiencing delays for approximately 2.5 miles, starting at Exit 30 (Bayhead Road). Westbound traffic is currently clear. Both directions are limited to a single lane because the eastbound bridge is closed for roadwork, and the center lane of the westbound bridge is closed for use as a buffer.

  18. 8:48 PMTraffic advisory

    As of 8:57 p.m. Wednesday, March 18th, eastbound traffic is experiencing delays starting at Exit 30 (Bay Head Road), approximately 2.5 miles from the bridge. The eastbound bridge is currently closed for roadwork, and traffic is being diverted to a single lane. Westbound traffic is moving normally with one lane open and no reported delays.

  19. 8:33 PMTraffic advisory

    Eastbound traffic is experiencing delays beginning at Exit 30, roughly 2.5 miles from the bridge. This backup is due to the eastbound bridge being closed for road work. All traffic is currently being diverted to the westbound bridge, which is operating with one lane open in each direction and the center lane closed as a buffer. Westbound traffic is currently clear with no delays.

  20. 8:33 PMTraffic advisory

    Eastbound traffic is currently experiencing a 2.5-mile backup starting at Exit 30. Westbound travel remains normal. The eastbound bridge is closed for roadwork, with traffic shifted to the westbound bridge where only one lane is open in each direction.

  21. 8:18 PMTraffic advisory

    Eastbound traffic is experiencing delays starting at Exit 31 (Whitehall Road), about 1.5 miles from the bridge, while westbound traffic remains clear. The eastbound bridge is closed for roadwork, resulting in two-way traffic on the westbound span. Both eastbound and westbound travel are limited to a single lane each, with the center lane closed as a buffer.

  22. 8:18 PMTraffic advisory

    Eastbound traffic is experiencing delays starting at Exit 31 (Whitehall Road), about 1.5 miles from the bridge, while westbound traffic remains clear. The eastbound bridge is closed for roadwork, resulting in two-way traffic on the westbound span. Both eastbound and westbound travel are limited to a single lane each, with the center lane closed as a buffer.

  23. 8:03 PMConstruction

    As of Wednesday at 8:12 p.m., there are no backups or delays at the Bay Bridge, and traffic is flowing normally. The eastbound bridge is currently closed for road work, and the center lane of the westbound bridge is closed as a buffer. As a result, traffic is restricted to one lane eastbound and one lane westbound.

  24. 7:48 PMConstruction

    As of Wednesday at 7:56 p.m., there are no backups or delays at the Bay Bridge, and traffic is moving at normal speeds in both directions. Currently, two lanes are open eastbound with the right lane closed for road work, and one lane is open westbound while the center lane serves as a buffer.

  25. 7:33 PMIssue reported

    As of Wednesday, March 18th at 7:42 PM, there are no backups or delays on or approaching the Bay Bridge. Traffic is currently flowing normally with three lanes open eastbound and one lane open westbound. The center lane on the westbound bridge is closed to serve as a buffer.

  26. 7:33 PMIssue reported

    As of Wednesday, March 18th at 7:42 PM, there are no backups or delays on or approaching the Bay Bridge. Traffic is currently flowing normally with three lanes open eastbound and one lane open westbound. The center lane on the westbound bridge is closed to serve as a buffer.

  27. 6:32 PMAll clear

    No delays are reported in either direction as of Wednesday, March 18th at 6:42 PM. Traffic is flowing normally with three lanes open eastbound and two lanes open westbound.

  28. 5:32 PMAll clear

    As of Wednesday, March 18th at 5:40 PM, traffic is flowing normally with no delays in either direction. The bridge is currently operating with three lanes open eastbound and two lanes open westbound.

  29. 5:18 PMTraffic advisory

    Eastbound delays currently begin at exit 28, roughly one mile from the Severn River Bridge. Traffic is moving normally across the Bay Bridge in both directions, with three lanes open eastbound and two lanes open westbound.

  30. 5:03 PMTraffic advisory

    Eastbound traffic is delayed starting at Exit 28, approximately one mile from the Severn River Bridge. The Bay Bridge itself is currently clear in both directions, with three lanes open eastbound and two lanes open westbound.

  31. 4:48 PMTraffic advisory

    As of Wednesday at 4:57 p.m., eastbound traffic heading toward the Severn River Bridge is delayed starting at Exit 28. Aside from this one-mile backup, travel across the Bay Bridge remains normal in both directions. There are currently three lanes open eastbound and two lanes open westbound.

  32. 4:33 PMTraffic advisory

    As of 4:42 p.m. on Wednesday, March 18th, there are no delays in either direction on the Bay Bridge, which is currently operating with three lanes eastbound and two lanes westbound. However, motorists traveling eastbound toward the Severn River Bridge should expect delays beginning at exit 28, approximately one mile from the bridge.

  33. 3:32 PMAll clear

    Traffic is currently clear with no delays in either direction. As of 3:42 PM on Wednesday, March 18th, the bridge is operating with three lanes open eastbound and two lanes open westbound. Travel times remain normal for both directions.

  34. 3:18 PMTraffic advisory

    Eastbound traffic is currently delayed for 1.5 miles starting at Exit 31 (Whitehall Road). Westbound traffic is moving normally with no delays, despite the left lane being closed for two-way traffic preparation.

  35. 3:03 PMConstruction

    As of 3:12 p.m. on Wednesday, March 18th, traffic is clear with no backups or delays in either direction. Travel times are currently normal for both eastbound and westbound commuters. The left lane is closed to prepare for two-way traffic operations.

  36. 3:03 PMConstruction

    As of 3:12 p.m. on Wednesday, March 18th, traffic is clear with no backups or delays in either direction. Travel times are currently normal for both eastbound and westbound commuters. The left lane is closed to prepare for two-way traffic operations.

  37. 2:03 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, with traffic moving at normal speeds. For those planning trips this weekend, the best times to travel are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  38. 1:03 PMAll clear

    As of Wednesday afternoon, there are currently no backups approaching the bridge in either direction and traffic is moving at normal speeds.

    For those planning to travel over the weekend, the best times to cross are:

    • Friday: Before 10 a.m. and after 10 p.m.
    • Saturday: Before 7 a.m. and after 5 p.m.
    • Sunday: Before 10 a.m. and after 10 p.m.
  39. 1:03 PMAll clear

    As of Wednesday afternoon, there are currently no backups approaching the bridge in either direction and traffic is moving at normal speeds.

    For those planning to travel over the weekend, the best times to cross are:

    • Friday: Before 10 a.m. and after 10 p.m.
    • Saturday: Before 7 a.m. and after 5 p.m.
    • Sunday: Before 10 a.m. and after 10 p.m.
  40. 12:03 PMAll clear

    Traffic is currently clear with no backups approaching the Bay Bridge in either direction.

    For those traveling this upcoming weekend, the best times to cross are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  41. 11:03 AMAll clear

    As of Wednesday, March 18th, at 11:12 a.m., there are no backups approaching the Bay Bridge in either direction.

    If you are traveling this coming weekend, the best times to cross are:

    • Friday: Before 10 a.m. and after 10 p.m.
    • Saturday: Before 7 a.m. and after 5 p.m.
    • Sunday: Before 10 a.m. and after 10 p.m.
  42. 11:03 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For those planning to travel this weekend, the best times to be on the road are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  43. 10:04 AMAll clear

    As of Wednesday morning, there are no backups approaching the bridge in either direction, and traffic is moving at normal speeds. For those planning weekend travel, the best times to head out are Friday and Sunday before 10 a.m. or after 10 p.m. On Saturday, aim to cross before 7 a.m. or after 5 p.m. to avoid delays.

  44. 10:03 AMAll clear

    As of Wednesday morning, there are no backups approaching the bridge in either direction, and traffic is moving at normal speeds. For those planning weekend travel, the best times to head out are Friday and Sunday before 10 a.m. or after 10 p.m. On Saturday, aim to cross before 7 a.m. or after 5 p.m. to avoid delays.

  45. 9:03 AMAll clear

    No backups are currently reported in either direction on or approaching the Bay Bridge, with traffic maintaining normal travel times. For those planning weekend trips, the lightest traffic is expected Friday before 10 a.m. and after 10 p.m., Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.

  46. 8:03 AMAll clear

    There are currently no backups approaching the bridge in either direction, and traffic is moving at normal speeds. For those planning travel this weekend, the best times to cross on Friday and Sunday are before 10 a.m. or after 10 p.m. On Saturday, the optimal windows are before 7 a.m. or after 5 p.m.

  47. 8:03 AMAll clear

    There are currently no backups approaching the bridge in either direction, and traffic is moving at normal speeds. For those planning travel this weekend, the best times to cross on Friday and Sunday are before 10 a.m. or after 10 p.m. On Saturday, the optimal windows are before 7 a.m. or after 5 p.m.

  48. 7:03 AMAll clear

    Traffic is currently clear with no backups approaching the bridge in either direction as of 7:12 a.m. on Wednesday, March 18th.

    If you are traveling this coming weekend, the best times to cross are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  49. 6:03 AMAll clear

    Traffic is currently clear with no backups in either direction, and travel times are normal. For those traveling this upcoming weekend, the best times to cross are before 10 a.m. and after 10 p.m. on Friday and Sunday. On Saturday, traffic is lightest before 7 a.m. and after 5 p.m.

  50. 5:03 AMAll clear

    As of 5:12 a.m. on Wednesday, March 18, traffic is moving normally with no backups approaching the Bay Bridge in either direction.

    For those planning trips over the upcoming weekend, the best times to travel are:

    • Friday: Before 10 a.m. and after 10 p.m.
    • Saturday: Before 7 a.m. and after 5 p.m.
    • Sunday: Before 10 a.m. and after 10 p.m.
  51. 5:03 AMAll clear

    As of 5:12 a.m. on Wednesday, March 18, traffic is moving normally with no backups approaching the Bay Bridge in either direction.

    For those planning trips over the upcoming weekend, the best times to travel are:

    • Friday: Before 10 a.m. and after 10 p.m.
    • Saturday: Before 7 a.m. and after 5 p.m.
    • Sunday: Before 10 a.m. and after 10 p.m.
  52. 4:48 AMIssue reported

    As of 4:56 a.m. on Wednesday, traffic is clear with no backups or delays in either direction. Travel times remain normal for both eastbound and westbound commuters. On the westbound bridge, the left lane is closed to discontinue two-way traffic operations.

  53. 4:48 AMConstruction

    As of 4:56 a.m. on Wednesday, traffic is clear with no backups or delays in either direction. Travel times remain normal for both eastbound and westbound commuters. On the westbound bridge, the left lane is closed to discontinue two-way traffic operations.

  54. 4:33 AMConstruction

    Traffic is currently clear with no backups or delays in either direction as of Wednesday, March 18th at 4:40 a.m. Both eastbound and westbound travel times are normal. While the two left lanes on the westbound bridge are closed to discontinue two-way traffic, the closure is not causing any congestion.

  55. 4:33 AMConstruction

    Traffic is currently clear with no backups or delays in either direction as of Wednesday, March 18th at 4:40 a.m. Both eastbound and westbound travel times are normal. While the two left lanes on the westbound bridge are closed to discontinue two-way traffic, the closure is not causing any congestion.

  56. 4:18 AMIssue reported

    There are currently no backups or delays at the Bay Bridge in either direction. As of 4:26 a.m. on Wednesday, March 18th, traffic is moving at normal speeds for both eastbound and westbound travel. On the bridge itself, the two left lanes are closed to transition away from two-way traffic operations.

  57. 4:18 AMIssue reported

    There are currently no backups or delays at the Bay Bridge in either direction. As of 4:26 a.m. on Wednesday, March 18th, traffic is moving at normal speeds for both eastbound and westbound travel. On the bridge itself, the two left lanes are closed to transition away from two-way traffic operations.

  58. 4:03 AMIssue reported

    Traffic is currently clear with no backups or delays. As of 4:11 a.m. on Wednesday, March 18th, the bridge is operating with one lane open in each direction. The eastbound bridge is closed, and the center lane on the westbound bridge is closed for a buffer lane. Travel times are normal for this time of day.

  59. 3:48 AMConstruction

    Traffic is currently clear with no backups or delays on or approaching the bridge. Operations are limited to one lane in each direction. The eastbound bridge is closed for a buffer lane, and the center lane of the westbound bridge is also closed. Travel times remain normal for both eastbound and westbound motorists.

  60. 3:48 AMConstruction

    Traffic is currently clear with no backups or delays on or approaching the bridge. Operations are limited to one lane in each direction. The eastbound bridge is closed for a buffer lane, and the center lane of the westbound bridge is also closed. Travel times remain normal for both eastbound and westbound motorists.

  61. 3:33 AMConstruction

    Traffic is currently clear with no backups or delays as of 3:41 a.m. Wednesday. Both eastbound and westbound travel times are normal. Operations are limited to one lane in each direction: the eastbound bridge is closed for a buffer lane, and the center lane on the westbound bridge is closed for a buffer lane.

  62. 3:33 AMConstruction

    Traffic is currently clear with no backups or delays as of 3:41 a.m. Wednesday. Both eastbound and westbound travel times are normal. Operations are limited to one lane in each direction: the eastbound bridge is closed for a buffer lane, and the center lane on the westbound bridge is closed for a buffer lane.

  63. 3:18 AMConstruction

    There are currently no backups or delays on the Bay Bridge, and traffic flow is normal. As of 3:26 a.m. on Wednesday, March 18th, the bridge is operating with only one lane open in each direction. The eastbound bridge is closed for a buffer lane, and the center lane on the westbound bridge is also closed.

  64. 3:18 AMConstruction

    There are currently no backups or delays on the Bay Bridge, and traffic flow is normal. As of 3:26 a.m. on Wednesday, March 18th, the bridge is operating with only one lane open in each direction. The eastbound bridge is closed for a buffer lane, and the center lane on the westbound bridge is also closed.

  65. 3:03 AMIssue reported

    Traffic is currently clear with no backups or delays. Travel times remain normal, though the bridge is restricted to one lane in each direction. The eastbound bridge is closed for a buffer lane, and the center lane of the westbound bridge is also closed for a buffer lane.

  66. 3:03 AMConstruction

    Traffic is currently clear with no backups or delays. Travel times remain normal, though the bridge is restricted to one lane in each direction. The eastbound bridge is closed for a buffer lane, and the center lane of the westbound bridge is also closed for a buffer lane.

  67. 2:48 AMConstruction

    As of 2:56 a.m. on Wednesday, March 18th, traffic is moving normally with no backups or delays on or approaching the bridge. Travel times in both directions are currently typical. The bridge is operating with one lane open eastbound and one lane open westbound. These restrictions are in place because the eastbound bridge is closed for a buffer lane, and the center lane of the westbound bridge is also closed for a buffer lane.

  68. 2:48 AMConstruction

    As of 2:56 a.m. on Wednesday, March 18th, traffic is moving normally with no backups or delays on or approaching the bridge. Travel times in both directions are currently typical. The bridge is operating with one lane open eastbound and one lane open westbound. These restrictions are in place because the eastbound bridge is closed for a buffer lane, and the center lane of the westbound bridge is also closed for a buffer lane.

  69. 2:33 AMConstruction

    Traffic is currently clear with no backups or delays. Flow remains normal in both directions. The bridge is currently operating with one lane open eastbound and one lane open westbound. The eastbound bridge and the center lane of the westbound bridge are closed for buffer lanes.

  70. 2:33 AMConstruction

    Traffic is currently clear with no backups or delays. Flow remains normal in both directions. The bridge is currently operating with one lane open eastbound and one lane open westbound. The eastbound bridge and the center lane of the westbound bridge are closed for buffer lanes.

  71. 2:18 AMConstruction

    There are no backups or delays on or approaching the bridge, and traffic is currently flowing at normal speeds. As of 2:26 a.m. on Wednesday, March 18th, the bridge is limited to one lane of travel in each direction. The eastbound bridge is closed for a buffer lane, and the center lane of the westbound bridge is also closed for a buffer.

  72. 2:13 AMBridge closed

    There are currently no backups or delays at the Bay Bridge, and traffic is flowing at normal speeds. Travel is limited to one lane in each direction. The eastbound bridge is closed for a buffer lane, and the center lane of the westbound bridge is also closed for a buffer.

  73. 2:13 AMIssue reported

    There are currently no backups or delays at the Bay Bridge, and traffic is flowing at normal speeds. Travel is limited to one lane in each direction. The eastbound bridge is closed for a buffer lane, and the center lane of the westbound bridge is also closed for a buffer.

  74. 1:58 AMConstruction

    As of 2:06 a.m. on Wednesday, March 18th, there are no backups or delays on or approaching the bridge, and traffic is moving at normal speeds. The bridge is currently limited to one lane of travel in each direction. The eastbound bridge is closed to serve as a buffer lane, and the center lane of the westbound bridge is also closed for buffer purposes.

  75. 1:58 AMConstruction

    As of 2:06 a.m. on Wednesday, March 18th, there are no backups or delays on or approaching the bridge, and traffic is moving at normal speeds. The bridge is currently limited to one lane of travel in each direction. The eastbound bridge is closed to serve as a buffer lane, and the center lane of the westbound bridge is also closed for buffer purposes.

  76. 1:43 AMConstruction

    Traffic is flowing normally with no backups or delays. Travel times are currently standard in both directions. The bridge is operating with one lane open eastbound and one lane open westbound; the eastbound bridge and the center lane of the westbound bridge are both closed for buffer lanes.

  77. 1:28 AMConstruction

    Traffic is moving normally with no backups or delays currently reported on or approaching the bridge. Operations are restricted to one lane eastbound and one lane westbound. The eastbound bridge is closed for a buffer lane, and the center lane of the westbound bridge is also closed for buffering.

  78. 1:28 AMConstruction

    Traffic is moving normally with no backups or delays currently reported on or approaching the bridge. Operations are restricted to one lane eastbound and one lane westbound. The eastbound bridge is closed for a buffer lane, and the center lane of the westbound bridge is also closed for buffering.

  79. 1:18 AMConstruction

    As of 1:26 a.m. on Wednesday, March 18, there are no backups or delays on or approaching the Bay Bridge, and travel times remain normal. The bridge is currently operating with one lane open for eastbound traffic and one lane open for westbound traffic. The eastbound bridge is closed for a buffer lane, and the center lane of the westbound bridge is also closed for a buffer.

  80. 1:03 AMIssue reported

    Traffic is currently moving normally with no backups or delays on or approaching the bridge. Travel is restricted to one lane eastbound and one lane westbound. The eastbound bridge is closed for a buffer lane, and the center lane on the westbound bridge is also closed.

  81. 1:03 AMIssue reported

    Traffic is currently moving normally with no backups or delays on or approaching the bridge. Travel is restricted to one lane eastbound and one lane westbound. The eastbound bridge is closed for a buffer lane, and the center lane on the westbound bridge is also closed.

  82. 12:53 AMConstruction

    As of 1:01 a.m. on Wednesday, March 18th, there are no backups or delays on or approaching the Bay Bridge, and traffic is moving at normal speeds. The bridge is currently limited to one lane of travel in each direction. The eastbound bridge is closed to act as a buffer, while the center lane of the westbound bridge is also closed for buffer purposes.

  83. 12:53 AMBridge closed

    As of 1:01 a.m. on Wednesday, March 18th, there are no backups or delays on or approaching the Bay Bridge, and traffic is moving at normal speeds. The bridge is currently limited to one lane of travel in each direction. The eastbound bridge is closed to act as a buffer, while the center lane of the westbound bridge is also closed for buffer purposes.

  84. 12:48 AMBridge closed

    Traffic is currently clear with no backups or delays at the Bay Bridge as of 12:56 a.m. Wednesday, March 18th. Travel times in both directions remain normal. The bridge is currently operating with one lane open eastbound and one lane open westbound. The eastbound bridge is closed for a buffer lane, and the center lane on the westbound bridge is also closed.

  85. 12:48 AMBridge closed

    Traffic is currently clear with no backups or delays at the Bay Bridge as of 12:56 a.m. Wednesday, March 18th. Travel times in both directions remain normal. The bridge is currently operating with one lane open eastbound and one lane open westbound. The eastbound bridge is closed for a buffer lane, and the center lane on the westbound bridge is also closed.

  86. 12:33 AMConstruction

    There are currently no backups or delays on or approaching the bridge. As of 12:42 AM on Wednesday, March 18th, traffic is flowing normally with one lane open eastbound and one lane open westbound. The eastbound bridge is closed for a buffer lane, and the center lane on the westbound bridge is also closed for a buffer.

  87. 12:18 AMConstruction

    As of 12:26 AM on Wednesday, March 18th, there are no backups or delays on or approaching the Bay Bridge. Traffic flow is normal in both directions. Current operations are restricted to one lane eastbound and one lane westbound. The eastbound bridge is closed for a buffer lane, and the center lane on the westbound bridge is also closed as a buffer.

  88. 12:18 AMConstruction

    As of 12:26 AM on Wednesday, March 18th, there are no backups or delays on or approaching the Bay Bridge. Traffic flow is normal in both directions. Current operations are restricted to one lane eastbound and one lane westbound. The eastbound bridge is closed for a buffer lane, and the center lane on the westbound bridge is also closed as a buffer.

  89. 12:08 AMConstruction

    As of Wednesday afternoon, there are currently no backups or delays on or approaching the Bay Bridge, and travel times remain at normal levels. Traffic is limited to one lane in each direction. The eastbound bridge is currently closed as a buffer lane, and the center lane of the westbound bridge is also closed for a buffer lane.

  90. 12:08 AMConstruction

    As of Wednesday afternoon, there are currently no backups or delays on or approaching the Bay Bridge, and travel times remain at normal levels. Traffic is limited to one lane in each direction. The eastbound bridge is currently closed as a buffer lane, and the center lane of the westbound bridge is also closed for a buffer lane.

  91. 12:03 AMBridge closed

    Traffic is currently flowing normally with no backups or delays in either direction. Current lane configurations include one lane open eastbound and one lane open westbound. The eastbound bridge is closed to provide a buffer lane, and the center lane on the westbound bridge is also closed for a buffer.

  92. 12:03 AMConstruction

    Traffic is currently flowing normally with no backups or delays in either direction. Current lane configurations include one lane open eastbound and one lane open westbound. The eastbound bridge is closed to provide a buffer lane, and the center lane on the westbound bridge is also closed for a buffer.