Live statusBay Bridge Status

Status history

Look up any past day on the Chesapeake Bay Bridge — closures, advisories, and BaySpan recordings.

March 2026

Sunday, March 8, 2026

Jump to today

99 updates logged

  1. 11:57 PMConstruction

    Traffic is currently clear with no backups or delays on or approaching the Bay Bridge. The westbound bridge is closed for road work, and traffic is currently operating in a two-way configuration with one lane open in each direction. Travel times remain within normal ranges.

  2. 11:42 PMConstruction

    Traffic is currently clear with no backups or delays as of 11:50 p.m. on Sunday, March 8th. The westbound bridge is closed for road work, and traffic is restricted to one lane eastbound and one lane westbound.

  3. 11:32 PMConstruction

    As of Sunday night, traffic is flowing normally with no backups or delays on or approaching the bridge. The westbound bridge is currently closed for road work, resulting in a traffic pattern of one lane in each direction.

  4. 11:17 PMConstruction

    As of 11:25 PM on Sunday, there are no backups or delays on or approaching the bridge, and traffic is moving at normal speeds. The westbound bridge is currently closed for road work, with traffic restricted to one lane in each direction.

  5. 11:02 PMConstruction

    Traffic is moving at normal speeds as of Sunday, March 8th at 11:11 pm. The westbound bridge is closed for road work, and travel is currently restricted to one lane in each direction.

  6. 10:47 PMConstruction

    As of 10:55 p.m. on Sunday, March 8th, there are no backups or delays currently on or approaching the Bay Bridge. Traffic flow is normal in both directions; however, the westbound bridge is closed for road work. All traffic is being diverted to the open span, which is operating with one lane open for westbound travel and one lane open for eastbound travel.

  7. 10:36 PMConstruction

    There are no backups or delays on or approaching the Bay Bridge, and travel times are currently normal. The westbound bridge is closed for road work, and traffic is operating with one lane open in each direction.

  8. 10:35 PMConstruction

    There are no backups or delays on or approaching the Bay Bridge, and travel times are currently normal. The westbound bridge is closed for road work, and traffic is operating with one lane open in each direction.

  9. 10:17 PMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge. As of Sunday at 10:25 p.m., traffic flow remains normal. The westbound bridge is closed for road work, and the crossing is operating with one lane open in each direction.

  10. 10:02 PMConstruction

    Traffic is flowing normally as of 10:11 p.m. on Sunday, March 8th. The westbound bridge is currently closed for road work, with all traffic sharing the eastbound span in a single-lane configuration for each direction.

  11. 9:47 PMConstruction

    Traffic is currently clear with no backups or delays. While travel times are normal, the westbound bridge is closed for road work. All traffic is currently being shifted to the remaining span, which is operating with one lane open in each direction.

  12. 9:47 PMConstruction

    Traffic is currently clear with no backups or delays. While travel times are normal, the westbound bridge is closed for road work. All traffic is currently being shifted to the remaining span, which is operating with one lane open in each direction.

  13. 9:32 PMConstruction

    As of Sunday, March 8th at 9:40 p.m., there are no backups or delays on or approaching the Bay Bridge. The westbound bridge is currently closed for road work, and traffic is operating with one lane open in each direction.

  14. 9:17 PMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge as of Sunday, March 8th at 9:25 p.m. Traffic is moving at normal durations in both directions. The westbound bridge is closed for roadwork, and traffic is currently diverted to the eastbound span where one lane is open in each direction.

  15. 9:17 PMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge as of Sunday, March 8th at 9:25 p.m. Traffic is moving at normal durations in both directions. The westbound bridge is closed for roadwork, and traffic is currently diverted to the eastbound span where one lane is open in each direction.

  16. 9:17 PMConstruction

    There are currently no backups or delays on or approaching the Bay Bridge as of Sunday, March 8th at 9:25 p.m. Traffic is moving at normal durations in both directions. The westbound bridge is closed for roadwork, and traffic is currently diverted to the eastbound span where one lane is open in each direction.

  17. 9:05 PMConstruction

    As of 9:10 PM on Sunday, March 8th, there are no backups or delays at the Bay Bridge and traffic flow remains normal. The westbound bridge is currently closed for road work, with all traffic shifted to the eastbound span operating with one lane in each direction.

  18. 9:05 PMConstruction

    As of 9:10 PM on Sunday, March 8th, there are no backups or delays at the Bay Bridge and traffic flow remains normal. The westbound bridge is currently closed for road work, with all traffic shifted to the eastbound span operating with one lane in each direction.

  19. 8:47 PMConstruction

    As of Sunday at 8:55 PM, there are no backups or delays on or approaching the Bay Bridge. Traffic is currently restricted to one lane westbound and one lane eastbound because the westbound bridge is closed for road work. Despite the lane closures, travel times remain normal in both directions.

  20. 8:47 PMConstruction

    As of Sunday at 8:55 PM, there are no backups or delays on or approaching the Bay Bridge. Traffic is currently restricted to one lane westbound and one lane eastbound because the westbound bridge is closed for road work. Despite the lane closures, travel times remain normal in both directions.

  21. 7:52 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction. For the best travel experience during the weekend, plan to cross on Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  22. 6:56 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is flowing at normal speeds. For those planning future weekend travel, the best times to cross are before 10 a.m. and after 10 p.m. on Fridays and Sundays, or before 7 a.m. and after 5 p.m. on Saturdays.

  23. 6:55 PMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is flowing at normal speeds. For those planning future weekend travel, the best times to cross are before 10 a.m. and after 10 p.m. on Fridays and Sundays, or before 7 a.m. and after 5 p.m. on Saturdays.

  24. 5:52 PMAll clear

    There are currently no backups approaching the bridge in either direction. For the best travel experience throughout the weekend, the recommended times to cross are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  25. 5:52 PMAll clear

    There are currently no backups approaching the bridge in either direction. For the best travel experience throughout the weekend, the recommended times to cross are Friday before 10 a.m. or after 10 p.m., Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.

  26. 4:52 PMAll clear

    Currently, there are no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For those planning travel throughout the weekend, the best times to cross are before 10 a.m. and after 10 p.m. on Fridays and Sundays. On Saturdays, the lightest traffic typically occurs before 7 a.m. and after 5 p.m.

  27. 4:52 PMAll clear

    Currently, there are no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds. For those planning travel throughout the weekend, the best times to cross are before 10 a.m. and after 10 p.m. on Fridays and Sundays. On Saturdays, the lightest traffic typically occurs before 7 a.m. and after 5 p.m.

  28. 3:53 PMAll clear

    Traffic is currently moving normally with no backups reported in either direction. For those planning travel over the remainder of the weekend, the best times to be on the road are before 10 a.m. and after 10 p.m. on Fridays and Sundays, or before 7 a.m. and after 5 p.m. on Saturdays.

  29. 3:52 PMAll clear

    As of 4 p.m. on Sunday, March 8th, there are no backups currently approaching the bridge in either direction, and traffic is moving at normal speeds. For the best weekend travel experience, plan to cross before 10 a.m. or after 10 p.m. on Fridays and Sundays, and before 7 a.m. or after 5 p.m. on Saturdays. Drivers should maintain a safe distance from the vehicle in front of them to avoid rear-end collisions.

  30. 2:52 PMAll clear

    Currently, there are no backups approaching the Bay Bridge in either direction, with traffic maintaining normal travel times.

    For those planning trips throughout the weekend, the best times to travel are:

    • Friday: Before 10 a.m. and after 10 p.m.
    • Saturday: Before 7 a.m. and after 5 p.m.
    • Sunday: Before 10 a.m. and after 10 p.m.
  31. 2:52 PMAll clear

    Currently, there are no backups approaching the Bay Bridge in either direction, with traffic maintaining normal travel times.

    For those planning trips throughout the weekend, the best times to travel are:

    • Friday: Before 10 a.m. and after 10 p.m.
    • Saturday: Before 7 a.m. and after 5 p.m.
    • Sunday: Before 10 a.m. and after 10 p.m.
  32. 2:45 PMFog advisory

    There are currently no backups in either direction on the Bay Bridge as of 2:50 p.m. on Sunday, March 8th. However, heavy fog is causing reduced visibility across the span. It is recommended to use low-beam headlights and maintain a safe following distance between vehicles while crossing.

  33. 2:30 PMFog advisory

    As of 2:35 p.m. on Sunday, March 8th, there are no backups on or approaching the Bay Bridge in either direction. While traffic is flowing at normal speeds, there is reduced visibility due to heavy fog across the span.

  34. 2:30 PMFog advisory

    As of 2:35 p.m. on Sunday, March 8th, there are no backups on or approaching the Bay Bridge in either direction. While traffic is flowing at normal speeds, there is reduced visibility due to heavy fog across the span.

  35. 2:16 PMFog advisory

    Westbound travelers on the Eastern Shore are experiencing delays on US 50 prior to MD 213. There are currently no backups on or approaching the Bay Bridge in either direction. Heavy fog is causing reduced visibility on the span, and two-way traffic operations are not in effect at this time.

  36. 2:16 PMFog advisory

    Westbound motorists are currently experiencing delays on US 50 prior to MD 213. While there are no backups on or approaching the Bay Bridge itself and travel times remain normal in both directions, heavy fog is causing reduced visibility across the span. Two-way traffic operations are not currently in effect.

  37. 1:58 PMFog advisory

    As of 2:05 p.m. on Sunday, March 8th, there are no backups on or approaching the Bay Bridge in either direction, and travel times remain at normal levels. While the bridge itself is clear, motorists traveling westbound on the Eastern Shore are experiencing delays along US 50 prior to MD 213. Additionally, heavy fog is causing reduced visibility on the bridge, requiring drivers to use low-beam headlights and maintain a safe following distance. Two-way traffic operations are not currently in effect.

  38. 1:57 PMFog advisory

    As of 2:05 p.m. on Sunday, March 8th, there are no backups on or approaching the Bay Bridge in either direction, and travel times remain at normal levels. While the bridge itself is clear, motorists traveling westbound on the Eastern Shore are experiencing delays along US 50 prior to MD 213. Additionally, heavy fog is causing reduced visibility on the bridge, requiring drivers to use low-beam headlights and maintain a safe following distance. Two-way traffic operations are not currently in effect.

  39. 1:48 PMFog advisory

    Westbound travelers on the Eastern Shore are currently experiencing delays along US 50 prior to MD 213. While there are no backups on or approaching the Bay Bridge in either direction and traffic flow remains normal, heavy fog is causing reduced visibility across the span. Drivers should use caution by keeping headlights on low beam and maintaining a safe following distance between vehicles. Two-way traffic operations are not currently in effect.

  40. 1:47 PMFog advisory

    Westbound travelers on the Eastern Shore are currently experiencing delays along US 50 prior to MD 213. There are no backups on or approaching the Bay Bridge in either direction, and traffic flow is normal. Heavy fog is causing reduced visibility across the span, and two-way traffic operations are not in effect at this time.

  41. 1:33 PMFog advisory

    As of 1:40 p.m. on Sunday, March 8, motorists traveling westbound on the Eastern Shore are experiencing delays along US 50 prior to MD 213. Currently, there are no backups on or approaching the Bay Bridge itself in either direction, and travel times remain within normal ranges. However, heavy fog is causing reduced visibility on the bridge. Drivers should use low beam headlights and maintain a safe following distance between vehicles. Two-way traffic operations are not currently in effect.

  42. 1:32 PMFog advisory

    As of 1:40 p.m. on Sunday, March 8, motorists traveling westbound on the Eastern Shore are experiencing delays along US 50 prior to MD 213. Currently, there are no backups on or approaching the Bay Bridge itself in either direction, and travel times remain within normal ranges. However, heavy fog is causing reduced visibility on the bridge. Drivers should use low beam headlights and maintain a safe following distance between vehicles. Two-way traffic operations are not currently in effect.

  43. 1:17 PMFog advisory

    Traffic is moving normally with no backups currently reported in either direction. However, there is reduced visibility on the bridge due to heavy fog. Use caution by keeping headlights on low beam and maintaining a safe following distance between vehicles.

  44. 1:02 PMFog advisory

    As of 1:10 p.m. on Sunday, March 8th, there are currently no traffic backups on or approaching the Bay Bridge in either direction. While travel times remain normal, heavy fog has significantly reduced visibility across the bridge. Exercise caution by using low-beam headlights and maintaining a safe following distance between vehicles.

  45. 12:47 PMFog advisory

    Traffic is currently clear with no backups in either direction, and travel times remain normal. However, heavy fog is causing reduced visibility across the bridge. Drivers should use low-beam headlights and maintain a safe following distance while traveling.

  46. 12:32 PMFog advisory

    As of 12:40 p.m. on Sunday, March 8th, there are no backups on or approaching the Bay Bridge in either direction, and travel times remain normal. However, motorists should exercise caution due to heavy fog causing reduced visibility across the span. It is recommended to keep headlights on low beam and maintain a safe following distance between vehicles while traveling.

  47. 12:32 PMFog advisory

    As of 12:40 p.m. on Sunday, March 8th, there are no backups on or approaching the Bay Bridge in either direction, and travel times remain normal. However, motorists should exercise caution due to heavy fog causing reduced visibility across the span. It is recommended to keep headlights on low beam and maintain a safe following distance between vehicles while traveling.

  48. 12:32 PMFog advisory

    As of 12:40 p.m. on Sunday, March 8th, there are no backups on or approaching the Bay Bridge in either direction, and travel times remain normal. However, motorists should exercise caution due to heavy fog causing reduced visibility across the span. It is recommended to keep headlights on low beam and maintain a safe following distance between vehicles while traveling.

  49. 12:20 PMFog advisory

    As of 12:25 p.m. on Sunday, March 8th, there are no backups in either direction on the Bay Bridge. Traffic is flowing at normal speeds; however, heavy fog is present across the span, resulting in reduced visibility.

  50. 12:20 PMFog advisory

    As of 12:25 p.m. on Sunday, March 8th, there are no backups in either direction on the Bay Bridge. Traffic is flowing at normal speeds; however, heavy fog is present across the span, resulting in reduced visibility.

  51. 12:02 PMFog advisory

    Traffic is currently clear with no backups reported in either direction, and travel times remain normal. However, heavy fog is causing reduced visibility across the bridge. Use caution while traveling by keeping headlights on low beam and maintaining a safe distance between vehicles.

  52. 11:52 AMFog advisory

    There are currently no backups on or approaching the Bay Bridge in either direction, and travel times remain normal. Heavy fog is present across the span, resulting in significantly reduced visibility.

  53. 11:45 AMFog advisory

    As of 11:50 a.m. on Sunday, March 8th, there are currently no backups approaching or traveling across the Bay Bridge in either direction. While traffic is moving at normal speeds, heavy fog is causing reduced visibility on the bridge. Use caution by keeping headlights on low beam and maintaining a safe following distance from other vehicles.

  54. 11:45 AMFog advisory

    As of 11:50 a.m. on Sunday, March 8th, there are currently no backups approaching or traveling across the Bay Bridge in either direction. While traffic is moving at normal speeds, heavy fog is causing reduced visibility on the bridge. Use caution by keeping headlights on low beam and maintaining a safe following distance from other vehicles.

  55. 11:27 AMFog advisory

    As of late Sunday morning, traffic is flowing normally with no backups approaching or on the bridge in either direction. While travel times remain standard, heavy fog has significantly reduced visibility across the span. Use caution by keeping headlights on low beam and maintaining a safe following distance between vehicles.

  56. 11:15 AMFog advisory

    Traffic is currently clear with no backups in either direction as of Sunday, March 8th at 11:20 a.m. While travel times are normal, heavy fog is causing reduced visibility on the bridge, so it is essential to use low-beam headlights and maintain a safe following distance.

  57. 11:15 AMFog advisory

    As of 11:20 a.m. on Sunday, March 8th, traffic is moving normally with no backups in either direction. Heavy fog is currently causing reduced visibility across the bridge.

  58. 10:12 AMAll clear

    There are currently no backups approaching the Bay Bridge in either direction, and traffic is moving at normal speeds.

    For those planning trips throughout the weekend, the best times to travel are:

    • Sunday: Before 10 a.m. and after 10 p.m.
    • Friday: Before 10 a.m. and after 10 p.m.
    • Saturday: Before 7 a.m. and after 5 p.m.
  59. 9:12 AMAll clear

    As of 9:20 a.m. on Sunday, March 8th, there are no backups approaching the Bay Bridge in either direction. Traffic is moving at normal speeds, with travel times currently slightly faster than typical durations for both eastbound and westbound commuters. For those planning to cross later today, the best times to travel are before 10 a.m. or after 10 p.m.

  60. 8:57 AMFog advisory

    Traffic is currently moving at normal speeds with no backups or delays in either direction on the Bay Bridge. However, heavy fog is causing significantly reduced visibility for travelers. Ensure your headlights stay on low beam and maintain a safe following distance between vehicles while crossing the span.

  61. 8:57 AMFog advisory

    As of 9:05 a.m. on Sunday, March 8th, there are no backups on or approaching the bridge in either direction. While traffic is currently flowing at normal durations, heavy fog is causing reduced visibility across the span.

  62. 8:42 AMFog advisory

    As of 8:50 a.m. on Sunday, March 8th, traffic is moving normally with no backups reported in either direction. However, travelers should be aware of heavy fog and reduced visibility currently affecting the bridge. Use caution by keeping headlights on low beam and maintaining a safe following distance between vehicles.

  63. 8:42 AMFog advisory

    As of 8:50 a.m. on Sunday, March 8th, traffic is moving normally with no backups reported in either direction. However, travelers should be aware of heavy fog and reduced visibility currently affecting the bridge. Use caution by keeping headlights on low beam and maintaining a safe following distance between vehicles.

  64. 8:27 AMFog advisory

    Traffic is currently clear with no backups in either direction. While travel times are normal, there is reduced visibility on the bridge due to heavy fog. Use caution by keeping headlights on low beam and maintaining a safe following distance between vehicles.

  65. 8:12 AMFog advisory

    As of 8:20 a.m. on Sunday, March 8th, there are no backups or delays in either direction on the Bay Bridge, and traffic is moving at normal speeds. Travelers should be aware of heavy fog and reduced visibility currently affecting the span.

  66. 8:00 AMFog advisory

    As of 8:05 AM on Sunday, March 8, traffic is clear with no backups on or approaching the Bay Bridge in either direction. While travel times are normal, there is currently reduced visibility due to heavy fog across the bridge.

  67. 8:00 AMFog advisory

    As of 8:05 AM on Sunday, March 8, traffic is clear with no backups on or approaching the Bay Bridge in either direction. While travel times are normal, there is currently reduced visibility due to heavy fog across the bridge.

  68. 7:42 AMFog advisory

    As of 7:50 a.m. on Sunday, March 8th, there are no backups on or approaching the Bay Bridge in either direction, and travel times remain normal. However, heavy fog has significantly reduced visibility across the span. Exercise caution by keeping headlights on low beam and maintaining a safe following distance between vehicles.

  69. 7:27 AMFog advisory

    As of 7:35 a.m. on Sunday, March 8th, there are no backups on or approaching the Bay Bridge in either direction. While traffic is moving at normal speeds, there is currently reduced visibility on the bridge due to heavy fog.

  70. 7:15 AMFog advisory

    As of 7:20 a.m. on Sunday, March 8th, traffic is moving normally with no backups on or approaching the Bay Bridge in either direction. There is currently heavy fog on the bridge causing reduced visibility; travel with low-beam headlights and maintain a safe following distance between vehicles.

  71. 7:15 AMFog advisory

    As of 7:20 a.m. on Sunday, March 8th, traffic is moving normally with no backups on or approaching the Bay Bridge in either direction. There is currently heavy fog on the bridge causing reduced visibility; travel with low-beam headlights and maintain a safe following distance between vehicles.

  72. 6:57 AMFog advisory

    Traffic is moving normally with no backups reported in either direction. Currently, the most important factor is heavy fog resulting in reduced visibility across the bridge.

  73. 6:42 AMFog advisory

    As of 6:50 a.m. on Sunday, March 8th, there are no backups on or approaching the Bay Bridge in either direction, and travel times remain normal. Heavy fog is currently causing reduced visibility across the span. Use caution by keeping headlights on low beam and maintaining a safe following distance between vehicles.

  74. 6:27 AMFog advisory

    Traffic is currently moving normally with no backups approaching the Bay Bridge in either direction. However, heavy fog is causing reduced visibility across the span. Use caution by keeping headlights on low beam and maintaining a safe following distance between vehicles.

  75. 6:12 AMFog advisory

    As of 6:20 a.m. on Sunday, March 8th, traffic is moving normally with no backups in either direction. While travel times are standard, heavy fog is causing reduced visibility on the bridge.

  76. 5:57 AMFog advisory

    As of 6:05 am on Sunday, March 8th, there are no backups on or approaching the Bay Bridge in either direction, and traffic is flowing at normal speeds. However, heavy fog is causing reduced visibility across the span. Travelers should use low-beam headlights and maintain a safe following distance between vehicles while crossing.

  77. 5:42 AMFog advisory

    As of 5:50 a.m. on Sunday, March 8th, traffic is moving normally with no backups reported in either direction. While travel times are standard, heavy fog on the bridge is causing reduced visibility. Ensure headlights are on low beam and maintain a safe following distance while crossing.

  78. 5:42 AMFog advisory

    There are currently no backups on or approaching the Bay Bridge in either direction. Traffic is flowing at normal speeds; however, heavy fog is present and causing reduced visibility across the span.

  79. 5:27 AMFog advisory

    Traffic is currently clear with no backups approaching the Bay Bridge in either direction. Flow is normal, though there is reduced visibility due to heavy fog. Use caution by keeping headlights on low beam and maintaining a safe following distance between vehicles.

  80. 5:12 AMFog advisory

    Traffic is currently clear with no backups and normal travel times in both directions. Heavy fog is causing reduced visibility on the bridge, so use caution by keeping headlights on low beam and maintaining a safe following distance between vehicles.

  81. 4:57 AMFog advisory

    As of 5:05 a.m. on Sunday, March 8th, traffic is moving normally with no backups approaching the Bay Bridge in either direction. Reduced visibility is currently a factor due to heavy fog, making it necessary to use low beam headlights and maintain a safe distance between vehicles.

  82. 4:27 AMFog advisory

    Traffic is currently clear with no backups in either direction. However, there is reduced visibility on the bridge due to heavy fog, and travelers should exercise caution.

  83. 4:27 AMFog advisory

    Traffic is currently clear with no backups in either direction. However, there is reduced visibility on the bridge due to heavy fog, and travelers should exercise caution.

  84. 4:17 AMFog advisory

    As of 4:25 a.m. on Sunday, March 8th, traffic is currently clear with no backups reported in either direction and travel times remaining normal. The primary concern for drivers is reduced visibility across the bridge due to heavy fog, which requires extra caution and increased following distances.

  85. 4:02 AMFog advisory

    Traffic is clear with no backups currently reported in either direction. Visibility is significantly reduced due to heavy fog, so use low beam headlights and maintain a safe following distance between vehicles.

  86. 3:47 AMFog advisory

    Traffic is currently clear with no backups approaching the bridge in either direction. However, heavy fog has significantly reduced visibility on the bridge, and drivers should use low-beam headlights while maintaining a safe following distance between vehicles.

  87. 3:32 AMFog advisory

    As of 3:40 a.m. on Sunday, March 8th, traffic is moving normally with no backups in either direction on the Bay Bridge. Although travel times are currently standard, heavy fog has resulted in reduced visibility across the span. Use caution by keeping headlights on low beam and maintaining a safe following distance between vehicles.

  88. 3:32 AMFog advisory

    As of 3:40 a.m. on Sunday, March 8th, traffic is moving normally with no backups in either direction on the Bay Bridge. Although travel times are currently standard, heavy fog has resulted in reduced visibility across the span. Use caution by keeping headlights on low beam and maintaining a safe following distance between vehicles.

  89. 3:17 AMFog advisory

    Traffic is currently clear with no backups and normal travel times in both directions. However, there is heavy fog resulting in reduced visibility across the bridge.

  90. 3:05 AMFog advisory

    Traffic is currently clear with no backups on or approaching the Bay Bridge in either direction. While flow is normal, heavy fog is causing reduced visibility across the span. Use caution by keeping headlights on low beam and maintaining a safe following distance between vehicles.

  91. 1:47 AMFog advisory

    Traffic is currently clear with no backups reported on or approaching the Bay Bridge in either direction. While travel times are normal, visibility is reduced due to heavy fog. Drivers should use low beam headlights and maintain a safe following distance while crossing.

  92. 1:32 AMFog advisory

    As of 1:40 a.m. on Sunday, March 8th, traffic is clear with no backups in either direction. However, heavy fog is causing reduced visibility on the bridge. Drivers should use low-beam headlights and maintain a safe following distance between vehicles.

  93. 1:17 AMFog advisory

    As of 1:25 a.m. on Sunday, March 8th, there are no backups on the Bay Bridge in either direction and traffic is moving at normal speeds. While travel times are standard, heavy fog is currently causing reduced visibility across the span.

  94. 1:06 AMFog advisory

    Traffic is currently clear with no backups reported in either direction, and travel times remain at normal durations. There is, however, heavy fog on the bridge causing reduced visibility. Use caution by keeping headlights on low beam and maintaining a safe following distance between vehicles.

  95. 12:47 AMFog advisory

    As of 12:55 a.m. on Sunday, March 8th, traffic is clear with no backups on or approaching the bridge in either direction. While travel times are normal, heavy fog has significantly reduced visibility, so be sure to use low-beam headlights and maintain a safe following distance from other vehicles.

  96. 12:32 AMFog advisory

    There are currently no backups on or approaching the Bay Bridge in either direction, and traffic is flowing at normal speeds. Heavy fog is causing reduced visibility across the span. Travelers should use caution, maintain a safe following distance, and keep headlights on low beam.

  97. 12:17 AMFog advisory

    Traffic is currently clear with no backups reported in either direction. While travel times are normal, heavy fog is significantly reducing visibility across the bridge.

  98. 12:17 AMFog advisory

    Traffic is currently clear with no backups reported in either direction. While travel times are normal, heavy fog is significantly reducing visibility across the bridge.

  99. 12:02 AMFog advisory

    As of 12:11 a.m. on Sunday, March 8th, traffic is clear with no backups reported in either direction on the Bay Bridge. While travel times are normal, heavy fog is currently causing reduced visibility across the span. Drivers should maintain a safe following distance and use low-beam headlights.