Status history
Look up any past day on the Chesapeake Bay Bridge — closures, advisories, and BaySpan recordings.
97 updates logged
- 11:47 PMConstruction
There are currently no backups or delays on or approaching the Bay Bridge. As of 11:55 p.m. on Saturday, February 14th, traffic is moving at normal speeds. The westbound bridge is closed for road work, and travel is restricted to one lane in each direction.
- 11:32 PMConstruction
There are currently no backups or delays at the Bay Bridge. As of 11:40 p.m. on Saturday, traffic is moving normally in both directions. The westbound bridge is closed for road work, so traffic is restricted to a two-way configuration on the eastbound bridge with one lane open for each direction.
- 11:17 PMConstruction
As of 11:25 p.m. on Saturday, February 14th, there are no backups or delays on or approaching the bridge. Traffic is moving normally, though the westbound bridge is currently closed for road work. All traffic is being filtered into one lane eastbound and one lane westbound.
- 11:02 PMConstruction
There are currently no backups or delays on or approaching the Bay Bridge. As of 11:10 p.m. on Saturday, February 14th, traffic is moving at normal speeds. The westbound bridge is closed for road work, and travel is restricted to one lane in each direction.
- 11:02 PMConstruction
There are no backups or delays approaching the Bay Bridge, and traffic is currently moving at normal speeds. The westbound bridge is closed for road work, so traffic is operating in a two-way configuration with one lane open in each direction.
- 10:52 PMConstruction
As of 11 p.m. on Saturday, February 14th, traffic is clear with no backups or delays on or approaching the Bay Bridge. The westbound bridge is currently closed for road work, and travel is restricted to one lane in each direction.
- 10:52 PMConstruction
As of 11 p.m. on Saturday, February 14th, traffic is clear with no backups or delays on or approaching the Bay Bridge. The westbound bridge is currently closed for road work, and travel is restricted to one lane in each direction.
- 10:47 PMBridge closed
Traffic is currently clear with no backups or delays on or approaching the Bay Bridge. As of 10:55 p.m. on Saturday, February 14th, the westbound bridge is closed for road work. All traffic is being diverted to the eastbound bridge, which is currently operating with one lane open in each direction. Travel times remain normal for both eastbound and westbound motorists.
- 10:32 PMConstruction
As of Saturday, February 14th at 10:40 p.m., there are currently no backups or delays on or approaching the Bay Bridge. While traffic is flowing normally, the westbound bridge is closed for road work. Because of this, traffic is limited to one lane in each direction.
- 10:32 PMConstruction
As of Saturday, February 14th at 10:40 p.m., there are no backups or delays on or approaching the Bay Bridge, and traffic is moving at normal speeds. The westbound bridge is currently closed for road work, so traffic is restricted to a two-way configuration with one lane open in each direction.
- 10:22 PMConstruction
There are no backups or delays on or approaching the Bay Bridge, and traffic is currently moving at normal speeds. As of 10:30 p.m. on Saturday, February 14th, the westbound bridge is closed for road work. All traffic is being diverted to the eastbound span, which is operating with one lane open in each direction.
- 10:07 PMTraffic advisory
Eastbound traffic is experiencing delays beginning at Exit 32 (Sandy Point), approximately one mile from the bridge. While westbound travel is currently clear, the westbound bridge is closed for maintenance. Two-way traffic is in effect, with only one lane open in each direction.
- 10:07 PMTraffic advisory
Eastbound traffic is experiencing delays beginning at Exit 32 (Sandy Point), approximately one mile from the bridge. While westbound travel is currently clear, the westbound bridge is closed for maintenance. Two-way traffic is in effect, with only one lane open in each direction.
- 9:57 PMTraffic advisory
As of 10:05 PM on Saturday, February 14th, eastbound traffic is experiencing delays starting at Exit 32 (Sandy Point), approximately one mile from the bridge. The westbound bridge is closed for roadwork, and traffic is currently narrowed down to one lane in each direction. There are no reported delays for westbound travel at this time.
- 9:57 PMTraffic advisory
As of 10:05 PM on Saturday, February 14th, eastbound traffic is experiencing delays starting at Exit 32 (Sandy Point), approximately one mile from the bridge. The westbound bridge is closed for roadwork, and traffic is currently narrowed down to one lane in each direction. There are no reported delays for westbound travel at this time.
- 9:52 PMBridge closed
As of 10 PM on Saturday, February 14th, eastbound traffic is experiencing delays beginning at Exit 32 (Sandy Point), approximately one mile from the bridge. Westbound traffic is currently moving normally. The westbound bridge is closed for roadwork, resulting in a two-way traffic configuration with only one lane open in each direction.
- 9:42 PMTraffic advisory
Eastbound traffic is experiencing delays starting at Exit 32 (Sandy Point), approximately one mile from the bridge. The westbound bridge is closed for roadwork, and traffic is currently diverted into a two-way operation with one lane open in each direction. Westbound travel remains clear with no reported delays.
- 9:42 PMTraffic advisory
Eastbound traffic is experiencing delays starting at Exit 32 (Sandy Point), approximately one mile from the bridge. The westbound bridge is closed for roadwork, and traffic is currently diverted into a two-way operation with one lane open in each direction. Westbound travel remains clear with no reported delays.
- 9:27 PMTraffic advisory
Eastbound traffic is currently delayed starting at Exit 32 (Sandy Point), approximately one mile from the bridge. Westbound traffic is moving without delays. The westbound bridge is closed for roadwork, with traffic restricted to one lane in each direction.
- 9:27 PMTraffic advisory
Eastbound traffic is experiencing delays starting at Sandy Point (Exit 32). The westbound bridge is closed for road work, and traffic is restricted to a single lane in each direction. Westbound travel remains clear.
- 9:12 PMTraffic advisory
Eastbound traffic is currently experiencing a one-mile backup starting at Exit 32 (Sandy Point). The westbound bridge is closed for roadwork, resulting in a two-way traffic configuration with only one lane open in each direction. While eastbound travelers are seeing delays, westbound traffic is currently clear.
- 9:12 PMTraffic advisory
Eastbound traffic is currently experiencing a one-mile backup starting at Exit 32 (Sandy Point). The westbound bridge is closed for roadwork, resulting in a two-way traffic configuration with only one lane open in each direction. While eastbound travelers are seeing delays, westbound traffic is currently clear.
- 9:07 PMBridge closed
Eastbound traffic is currently experiencing delays beginning at Exit 32 (Sandy Point) due to the westbound bridge being closed for roadwork. All travel is restricted to a two-way configuration with only one lane open in each direction. While eastbound is backed up for approximately one mile, westbound traffic remains clear.
- 9:07 PMTraffic advisory
Eastbound traffic is currently experiencing delays beginning at Exit 32 (Sandy Point) due to the westbound bridge being closed for roadwork. All travel is restricted to a two-way configuration with only one lane open in each direction. While eastbound is backed up for approximately one mile, westbound traffic remains clear.
- 9:02 PMBridge closed
As of 9:10 PM on Saturday, February 14th, eastbound traffic is experiencing delays beginning at Exit 32 (Sandy Point). The westbound bridge is closed for roadwork, resulting in two-way traffic operations with only one lane open in each direction. There are currently no delays reported for westbound travel.
- 9:02 PMBridge closed
As of Saturday, February 14th at 9:10 PM, eastbound traffic is experiencing delays starting at Exit 32 Sandy Point. The westbound bridge is closed for roadwork, and travel is restricted to a single lane in both directions. Westbound traffic is currently clear.
- 8:47 PMTraffic advisory
Eastbound traffic is currently experiencing delays beginning at Exit 32 (Sandy Point), approximately one mile from the bridge. The westbound bridge is closed for roadwork, and traffic is being diverted into a two-way configuration with one lane open in each direction. Westbound travel remains clear with no reported delays.
- 8:32 PMTraffic advisory
Eastbound traffic is experiencing delays starting at Exit 32 (Sandy Point), roughly one mile from the bridge. Westbound traffic is currently clear. Due to ongoing roadwork, the westbound bridge is closed, and traffic is restricted to one lane in each direction.
- 8:17 PMConstruction
There are currently no backups or delays on or approaching the Bay Bridge. While traffic is moving normally, the westbound bridge is closed for road work. Consequently, the bridge is operating under a two-way traffic pattern with only one lane open in each direction.
- 8:17 PMConstruction
There are currently no backups or delays on or approaching the Bay Bridge. The westbound bridge is closed for roadwork, resulting in a two-way traffic pattern with one lane open in each direction. While this configuration is causing travel times to run slightly higher than usual, traffic flow remains steady.
- 8:02 PMConstruction
No backups or delays are currently reported on or approaching the bridge. The westbound bridge is closed for road work, with traffic restricted to one lane in each direction.
- 7:47 PMConstruction
Traffic is currently clear with no backups or delays. The westbound bridge is closed for road work, and traffic is being diverted to the eastbound span. As a result, only one lane is open in each direction. While travel times are slightly higher than usual, they remain near normal durations.
- 7:47 PMConstruction
Traffic is currently clear with no backups or delays. The westbound bridge is closed for road work, and traffic is being diverted to the eastbound span. As a result, only one lane is open in each direction. While travel times are slightly higher than usual, they remain near normal durations.
- 7:32 PMConstruction
Currently, there are no backups or delays in either direction on the Bay Bridge. Eastbound traffic is moving at normal speeds despite the left lane being closed for two-way traffic preparation. Westbound travel also remains unaffected by roadwork that has the two right lanes closed. Traffic flow in both directions is consistent with typical travel times.
- 7:17 PMConstruction
Traffic is currently clear with no delays or backups in either direction on the Bay Bridge. Despite the two right lanes being closed for construction, westbound traffic is moving normally. Maintain a safe following distance from other vehicles to avoid rear-end collisions.
- 6:17 PMAll clear
Traffic is currently clear with no backups in either direction. For those traveling during the remainder of the weekend, the best times to cross are Saturday after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.
- 6:17 PMAll clear
Traffic is currently clear with no backups in either direction. For those traveling during the remainder of the weekend, the best times to cross are Saturday after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.
- 5:17 PMAll clear
As of 5:25 PM on Saturday, February 14th, there are currently no backups approaching the Bay Bridge in either direction, and traffic flow remains normal. For those traveling through the remainder of the weekend, the best times to move on Sunday are before 10 a.m. and after 10 p.m.
- 5:17 PMAll clear
Traffic is currently clear with no backups approaching the Bay Bridge in either direction as of 5:25 PM on Saturday, February 14th. For the remainder of the weekend, the best times to travel are Saturday after 5 p.m. and Sunday before 10 a.m. or after 10 p.m.
- 4:17 PMAll clear
As of 4:25 p.m. on Saturday, February 14th, there are no backups approaching the Bay Bridge in either direction, and travel times are currently normal. For those planning trips throughout the remainder of the weekend, the best times to travel are Saturday after 5 p.m. and Sunday before 10 a.m. or after 10 p.m.
- 4:17 PMAll clear
As of 4:25 p.m. on Saturday, February 14th, there are no backups approaching the Bay Bridge in either direction, and travel times are currently normal. For those planning trips throughout the remainder of the weekend, the best times to travel are Saturday after 5 p.m. and Sunday before 10 a.m. or after 10 p.m.
- 3:17 PMAll clear
Traffic is currently clear with no backups in either direction, and travel times are holding at normal durations. If you are planning further travel this weekend, the best times to be on the road are after 5 p.m. today or during the off-peak windows on Sunday, which are before 10 a.m. and after 10 p.m.
- 2:17 PMAll clear
As of 2:25 PM on Saturday, there are no backups approaching the Bay Bridge in either direction, and travel times remain normal. For those planning trips throughout the remainder of the weekend, the best times to travel on Saturday are before 7 a.m. and after 5 p.m. On Sunday, traffic is expected to be lightest before 10 a.m. and after 10 p.m.
- 2:02 PMIssue reported
Traffic is currently moving normally with no delays in either direction. Both eastbound and westbound travel times are consistent with typical durations. Note that the left lane on the bridge is closed for the discontinuation of two-way traffic.
- 2:02 PMIssue reported
Traffic is currently moving normally with no delays in either direction. Both eastbound and westbound travel times are consistent with typical durations. Note that the left lane on the bridge is closed for the discontinuation of two-way traffic.
- 1:52 PMIssue reported
As of 2 p.m. on Saturday, February 14th, there are no backups or delays on the Bay Bridge in either direction. Traffic is currently moving at normal speeds for both eastbound and westbound travelers. Although the left lane is closed to discontinue two-way traffic, it is not causing any disruptions to travel times.
- 1:52 PMIssue reported
As of 2 p.m. on Saturday, February 14th, there are no backups or delays on the Bay Bridge in either direction. Traffic is currently moving at normal speeds for both eastbound and westbound travelers. Although the left lane is closed to discontinue two-way traffic, it is not causing any disruptions to travel times.
- 1:37 PMIssue reported
As of Saturday, February 14th at 1:45 p.m., there are no backups or delays in either direction on the Bay Bridge. Traffic is flowing at normal speeds for both eastbound and westbound travelers. Although the westbound left lane is currently closed to discontinue two-way traffic, this closure is not impacting travel times.
- 1:37 PMIssue reported
As of Saturday, February 14th at 1:45 p.m., there are no backups or delays in either direction on the Bay Bridge. Traffic is flowing at normal speeds for both eastbound and westbound travelers. Although the westbound left lane is currently closed to discontinue two-way traffic, this closure is not impacting travel times.
- 1:27 PMIssue reported
There are currently no backups or delays in either direction on the Bay Bridge. As of 1:35 p.m. on Saturday, February 14th, traffic flow remains normal for both eastbound and westbound travel. While the left lane is closed on the westbound bridge to discontinue two-way traffic, this configuration is not causing any delays.
- 1:27 PMIssue reported
There are currently no backups or delays in either direction on the Bay Bridge. As of 1:35 p.m. on Saturday, February 14th, traffic flow remains normal for both eastbound and westbound travel. While the left lane is closed on the westbound bridge to discontinue two-way traffic, this configuration is not causing any delays.
- 1:12 PMIssue reported
As of 1:20 p.m. on Saturday, traffic is flowing normally with no backups or delays in either direction. While the left lane is currently closed westbound to transition away from two-way traffic, travel times remain standard. Drivers should maintain a safe following distance to avoid rear-end collisions.
- 12:17 PMAll clear
Traffic is currently clear in both directions on the Bay Bridge. As of Saturday afternoon, there are no reported delays, with three lanes open eastbound and two lanes open westbound. Traffic flow is maintaining normal travel times.
- 12:17 PMAll clear
Traffic is currently clear in both directions on the Bay Bridge. As of Saturday afternoon, there are no reported delays, with three lanes open eastbound and two lanes open westbound. Traffic flow is maintaining normal travel times.
- 11:17 AMAll clear
Traffic is currently clear with no delays in either direction. As of 11:25 a.m. on Saturday, February 14th, the bridge is operating with three lanes open eastbound and two lanes open westbound, with travel times remaining normal.
- 11:17 AMAll clear
Traffic is currently clear with no delays in either direction. As of 11:25 a.m. on Saturday, February 14th, the bridge is operating with three lanes open eastbound and two lanes open westbound, with travel times remaining normal.
- 11:02 AMConstruction
Traffic is currently clear with no backups or delays reported in either direction. Although the left lane on the westbound bridge is closed to prepare for two-way traffic, travel times remain normal.
- 10:02 AMAll clear
As of 10:10 a.m. on Saturday, there are currently no backups approaching the bridge in either direction and traffic is moving at normal speeds. For those traveling throughout the remainder of the weekend, the best times to be on the road are Saturday after 5 p.m. and Sunday either before 10 a.m. or after 10 p.m.
- 10:02 AMAll clear
As of 10:10 a.m. on Saturday, there are currently no backups approaching the bridge in either direction and traffic is moving at normal speeds. For those traveling throughout the remainder of the weekend, the best times to be on the road are Saturday after 5 p.m. and Sunday either before 10 a.m. or after 10 p.m.
- 9:02 AMAll clear
There are currently no backups approaching the Bay Bridge in either direction, and travel times remain normal. For those traveling throughout the weekend, the best times to avoid congestion are Saturday after 5 p.m. and Sunday before 10 a.m. or after 10 p.m.
- 9:02 AMAll clear
There are currently no backups approaching the Bay Bridge in either direction, and travel times remain normal. For those traveling throughout the weekend, the best times to avoid congestion are Saturday after 5 p.m. and Sunday before 10 a.m. or after 10 p.m.
- 8:02 AMAll clear
As of 8:10 a.m. Saturday, traffic is moving at normal speeds with no backups reported in either direction. If you are traveling later this weekend, the best times to avoid congestion are Saturday after 5 p.m. and Sunday before 10 a.m. or after 10 p.m.
- 7:02 AMAll clear
There are currently no backups approaching the bridge in either direction, and traffic flow remains normal. For those traveling through the remainder of the weekend, the best times to be on the road are Saturday after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.
- 7:02 AMAll clear
There are currently no backups approaching the bridge in either direction, and traffic flow remains normal. For those traveling through the remainder of the weekend, the best times to be on the road are Saturday after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.
- 6:07 AMAll clear
As of 6:15 a.m. on Saturday, February 14th, traffic is clear with no backups on or approaching the bridge in either direction. Travel times are currently normal. For the remainder of the weekend, the best times to travel are Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.
- 6:07 AMAll clear
As of 6:15 a.m. on Saturday, February 14th, traffic is clear with no backups on or approaching the bridge in either direction. Travel times are currently normal. For the remainder of the weekend, the best times to travel are Saturday before 7 a.m. or after 5 p.m., and Sunday before 10 a.m. or after 10 p.m.
- 5:07 AMAll clear
As of 5:15 a.m. on Saturday, February 14th, traffic is clear with no backups approaching the Bay Bridge in either direction. Travel times are currently normal. To avoid congestion throughout the remainder of the weekend, the best times to travel are Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.
- 5:07 AMAll clear
As of 5:15 a.m. on Saturday, February 14th, traffic is clear with no backups approaching the Bay Bridge in either direction. Travel times are currently normal. To avoid congestion throughout the remainder of the weekend, the best times to travel are Saturday before 7 a.m. and after 5 p.m., and Sunday before 10 a.m. and after 10 p.m.
- 4:07 AMAll clear
There are currently no backups approaching the Bay Bridge in either direction, and traffic is flowing at normal speeds. For those traveling later this weekend, the best times to cross on Saturday are before 7 a.m. or after 5 p.m. On Sunday, plan to travel before 10 a.m. or after 10 p.m. to avoid delays.
- 3:52 AMIssue reported
Traffic is currently clear with no backups approaching the bridge in either direction. As of 4 a.m. Saturday, February 14th, travel times remain normal for both eastbound and westbound commuters. The left lane on the westbound bridge is closed to facilitate the discontinuation of two-way traffic.
- 3:37 AMIssue reported
Traffic is currently clear with no backups or delays on or approaching the Bay Bridge as of Saturday, February 14th at 3:45 a.m. Travel times are normal in both directions. The bridge is operating with one lane open westbound and three lanes open eastbound, while the center lane on the westbound bridge remains closed for a buffer.
- 3:22 AMTraffic advisory
Eastbound traffic is experiencing delays starting at Exit 31 (Whitehall Road), about 1.5 miles from the bridge. The eastbound span is closed for road work, forcing all traffic into a two-way flow on the westbound bridge with only one lane open in each direction. Westbound travel remains normal with no delays, though the center lane is currently closed as a buffer.
- 3:22 AMTraffic advisory
Eastbound traffic is experiencing delays starting at Exit 31 (Whitehall Road), about 1.5 miles from the bridge. The eastbound span is closed for road work, forcing all traffic into a two-way flow on the westbound bridge with only one lane open in each direction. Westbound travel remains normal with no delays, though the center lane is currently closed as a buffer.
- 3:17 AMBridge closed
Eastbound traffic is experiencing delays starting at Whitehall Road, approximately 1.5 miles from the bridge. The eastbound span is closed for roadworks, and traffic is being diverted to the center lane of the westbound bridge. Westbound travel is currently clear.
- 3:17 AMBridge closed
Eastbound traffic is experiencing delays starting at Whitehall Road, approximately 1.5 miles from the bridge. The eastbound span is closed for roadworks, and traffic is being diverted to the center lane of the westbound bridge. Westbound travel is currently clear.
- 3:12 AMBridge closed
Eastbound traffic is currently experiencing delays starting at Exit 31 (Whitehall Road), about 1.5 miles from the bridge. This congestion is due to the eastbound bridge being closed for roadwork. All traffic is being diverted to the westbound bridge, which is currently operating with one lane open in each direction and a center buffer lane closed. Westbound travel remains clear with no reported delays.
- 3:12 AMBridge closed
Eastbound traffic is currently experiencing delays starting at Exit 31 (Whitehall Road), about 1.5 miles from the bridge. This congestion is due to the eastbound bridge being closed for roadwork. All traffic is being diverted to the westbound bridge, which is currently operating with one lane open in each direction and a center buffer lane closed. Westbound travel remains clear with no reported delays.
- 2:57 AMTraffic advisory
Eastbound traffic is currently experiencing delays starting at exit 31 (Whitehall Road), approximately 1.5 miles from the bridge. This backup is due to the eastbound bridge being closed for road work. Traffic is currently being funneled into a two-way, single-lane configuration on the westbound span, with the center lane closed to act as a buffer. There are no delays reported for westbound travel.
- 2:42 AMTraffic advisory
Eastbound traffic is experiencing delays beginning at Exit 31 (Whitehall Road), roughly 1.5 miles from the bridge. The eastbound bridge is closed for road work, and the center lane of the westbound bridge is closed as a buffer. Consequently, traffic is limited to one lane in each direction on the westbound bridge. Westbound traffic remains clear at this time.
- 2:42 AMTraffic advisory
Eastbound traffic is experiencing delays beginning at Exit 31 (Whitehall Road), roughly 1.5 miles from the bridge. The eastbound bridge is closed for road work, and the center lane of the westbound bridge is closed as a buffer. Consequently, traffic is limited to one lane in each direction on the westbound bridge. Westbound traffic remains clear at this time.
- 2:27 AMTraffic advisory
Eastbound traffic is currently experiencing delays starting at Exit 31 (Whitehall Road), roughly 1.5 miles from the bridge. The eastbound bridge is closed for road work, requiring all traffic to use the westbound span. Currently, there is only one lane open in each direction, with the center lane of the westbound bridge closed as a buffer. Westbound traffic is moving normally with no reported delays.
- 2:27 AMTraffic advisory
Eastbound traffic is currently experiencing delays starting at Exit 31 (Whitehall Road), roughly 1.5 miles from the bridge. The eastbound bridge is closed for road work, requiring all traffic to use the westbound span. Currently, there is only one lane open in each direction, with the center lane of the westbound bridge closed as a buffer. Westbound traffic is moving normally with no reported delays.
- 2:12 AMTraffic advisory
Eastbound traffic is currently experiencing delays starting at Exit 31 (Whitehall Road), roughly 1.5 miles from the bridge. This backup is due to the eastbound bridge being closed for road work. All traffic is being diverted to the westbound bridge, which is operating with only one lane open in each direction. Westbound traffic remains clear.
- 2:12 AMTraffic advisory
Eastbound traffic is currently experiencing delays starting at Exit 31 (Whitehall Road), roughly 1.5 miles from the bridge. This backup is due to the eastbound bridge being closed for road work. All traffic is being diverted to the westbound bridge, which is operating with only one lane open in each direction. Westbound traffic remains clear.
- 1:57 AMTraffic advisory
Eastbound traffic is experiencing delays starting at Exit 31 (Whitehall Road), approximately 1.5 miles from the bridge. The eastbound bridge is closed for road work, with all traffic diverted to the westbound bridge. Currently, the westbound span is operating with one lane for eastbound travel and one lane for westbound travel, while the center lane remains closed as a buffer. Westbound traffic is moving normally.
- 1:52 AMBridge closed
Eastbound traffic is currently experiencing delays beginning at Exit 31 (Whitehall Road), approximately 1.5 miles from the bridge. The eastbound bridge is closed for road work, with all traffic diverted to the westbound bridge. Currently, the westbound bridge is operating with one lane open in each direction and the center lane closed as a buffer. Westbound traffic is currently clear with no delays.
- 1:37 AMTraffic advisory
As of 1:45 a.m. on Saturday, February 14th, eastbound traffic is experiencing delays starting 1.5 miles from the bridge at Exit 31 (Whitehall Road). The eastbound bridge is closed for road work, and traffic is being diverted to the westbound bridge, which is currently operating with one lane open in each direction. Westbound traffic remains clear with no reported delays.
- 1:22 AMTraffic advisory
As of 1:30 a.m. on Saturday, February 14th, eastbound traffic is experiencing a 1.5-mile delay beginning at Exit 31 (Whitehall Road). The eastbound bridge is closed for road work, and traffic is being diverted to the westbound bridge. This has resulted in a traffic pattern where only one lane is open in each direction. Currently, there are no delays for westbound travelers.
- 1:22 AMTraffic advisory
As of 1:30 a.m. on Saturday, February 14th, eastbound traffic is experiencing a 1.5-mile delay beginning at Exit 31 (Whitehall Road). The eastbound bridge is closed for road work, and traffic is being diverted to the westbound bridge. This has resulted in a traffic pattern where only one lane is open in each direction. Currently, there are no delays for westbound travelers.
- 1:07 AMTraffic advisory
Eastbound traffic is experiencing delays starting at Whitehall Road (Exit 31), approximately 1.5 miles from the bridge. The eastbound bridge is closed for roadwork, and all traffic is being diverted to the westbound span. Currently, the bridge is operating with one lane open in each direction. While eastbound travelers are facing backups, westbound traffic remains clear.
- 1:07 AMTraffic advisory
Eastbound traffic is experiencing delays starting at Whitehall Road (Exit 31), approximately 1.5 miles from the bridge. The eastbound bridge is closed for roadwork, and all traffic is being diverted to the westbound span. Currently, the bridge is operating with one lane open in each direction. While eastbound travelers are facing backups, westbound traffic remains clear.
- 12:52 AMTraffic advisory
Eastbound traffic is experiencing delays beginning at Exit 31 (Whitehall Road), approximately 1.5 miles from the bridge, while westbound traffic is currently clear. The eastbound bridge is closed for road work, resulting in a two-way traffic configuration on the westbound bridge with only one lane open in each direction.
- 12:37 AMTraffic advisory
Eastbound traffic is experiencing a 1.5-mile delay beginning at Exit 31 (Whitehall Road) because the eastbound bridge is closed for road work. All vehicles are being diverted to the westbound bridge, which is currently operating with one lane in each direction and a closed center buffer lane. Westbound traffic remains clear with no reported delays.
- 12:22 AMTraffic advisory
Eastbound traffic is currently experiencing delays starting at Exit 31 (Whitehall Road), approximately 1.5 miles from the bridge, due to the eastbound bridge being closed for roadwork. Operations are currently limited to one lane in each direction sharing the westbound bridge, with the center lane closed as a buffer. Westbound traffic is currently moving normally with no delays.
- 12:22 AMTraffic advisory
Eastbound traffic is currently experiencing delays starting at Exit 31 (Whitehall Road), approximately 1.5 miles from the bridge, due to the eastbound bridge being closed for roadwork. Operations are currently limited to one lane in each direction sharing the westbound bridge, with the center lane closed as a buffer. Westbound traffic is currently moving normally with no delays.
- 12:07 AMTraffic advisory
Eastbound traffic is experiencing delays beginning at Exit 31 (Whitehall Road), approximately 1.5 miles from the bridge. The eastbound bridge is currently closed for road work, shifting all travel to the westbound bridge where traffic is limited to one lane in each direction. While the center lane on the westbound bridge is closed as a buffer, westbound travel remains clear with no current delays.
- 12:07 AMTraffic advisory
Eastbound traffic is experiencing delays beginning at Exit 31 (Whitehall Road), approximately 1.5 miles from the bridge. The eastbound bridge is currently closed for road work, shifting all travel to the westbound bridge where traffic is limited to one lane in each direction. While the center lane on the westbound bridge is closed as a buffer, westbound travel remains clear with no current delays.